Similar Projects
RFQ Engineering - Construction of Water Transmission Line
Infrastructure
Bidding
$1,852,000 CJ est. value
Evanston, WY 82930

Fort Bridger Airport – Taxiway A/SE Apron
Infrastructure
Bidding
$500,000 CJ est. value
Evanston, WY 82930

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

Avalon International Metal Building, Foundation, and Site Improvement Package
New Construction, Infrastructure
Post-Bid
Evanston, WY 82930

District 3 Stockpiles
Infrastructure
Results

District 3 Crack Seal
Infrastructure
Results

Construction of the Joy Lane Waterline Project
Infrastructure
Construction
$52,590 CJ est. value
Lyman, WY 82937

Construction of the Joy Lane Waterline Project
Infrastructure
Construction
$52,590 CJ est. value
Lyman, WY 82937

Lyman Aquatic Center Air Handlers and Boiler Upgrade
Renovation
Post-Bid
$1,000,000 CJ est. value
Lyman, WY 82937

Bituminous Pavement Surfacing
Infrastructure
Results

Street Maintenance Project
Infrastructure
Post-Bid
$400,000 est. value
Evanston, WY

Mill and Overlay, Right-of-Way Fence Replacement
Infrastructure
Results

Construction of Asphalt Pavement Improvements
Infrastructure
Post-Bid
$300,000 est. value
Evanston, WY

Street Crack Seal Project - Summer 2022
Infrastructure
Results
Evanston, WY

Asphalt Patching, Crack Sealing, Seal Coating, and Striping of Parking Lot
Infrastructure
Post-Bid
$275,000 est. value
Evanston, WY 82930

Last Updated 03/07/2023 12:34 AM
Project Title

High School Sidewalk and Entrance Replacement Project 2023

Physical Address View project details and contacts
City, State (County) Mountain View, WY 82939   (Uinta County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement - Marking, Demolition/Building Removal/Hauling/Salvage, Concrete Walkway, Meter Vault Improvements, Masonry Construction & Restoration, Fire Hydrant, Stormwater Improvements, Waterlines Remove and replace existing concrete sidewalk and entryway for the High School. Also relocating a Fire Hydrant and FDC. Replacing a sump pit and meter pit. Remove and replace a small area with brick. Est. Value Notes: $200,000.00 to $250,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents