Similar Projects
RFP Construction Manager at Risk - Bennington Public Schools New High School Facility Project
New Construction, Infrastructure
Design
$36,000,000 CJ est. value
Bennington, NE 68007

OPS South High 2022 Capital Improvements
Renovation
Bidding
$1,250,000 CJ est. value
Omaha, NE 68107

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Douglas County Health Center COVID-19 HVAC Upgrades Phase II
Alteration
Results
Omaha, NE 68105

Rohwer Elementary School Heat Pump Replacement
Alteration
Results
Omaha, NE

Westside High School West Campus AHU Replacement - Phase I
Alteration
Post-Bid
Omaha, NE 68144

South High School Elevator Modernization
Renovation
Results
NE

Air Filters for Facilities Management (City) and Public Properties (County)
Alteration
Post-Bid
NE

Andersen Middle School Heat Pump Replacement - Phase I
Alteration
Results
Omaha, NE 68137

Jones Street Station Units 1 and 2 Exhaust Stacks Replacement
Alteration
Post-Bid
Omaha, NE 68105

Morton Elementary School Multizone Rooftop Unit Replacement
Alteration
Results
Omaha, NE 68130

MPS - (North High School) West Loading Dock Repair
Renovation
Post-Bid
Omaha, NE 68154

Millard West High School Varsity Lockers Replacement
Alteration
Results
Omaha, NE 68135

North High School Tennis Court Replacement
Renovation
Post-Bid
Omaha, NE 68154

Last Updated 08/15/2022 11:31 PM
Project Title

South High School AHU Replacement

Physical Address View project details and contacts
City, State (County) Omaha, NE 68137   (Douglas County)
Category(s) Education, Single Trades
Sub-Category(s) HVAC, Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

South High Air Handling Unit (AHU) Replacement The entire project is within Millard South High School (MSHS) campus, 147th and Q Streets. The project consists of air-cooled chiller and pump (add alternate) replacement. Millard Public Schools (hereinafter referred to as the District or MPS) invites bids on: AHU Replacement South High School 14905 Q Street Omaha, NE, Only complete sets of Bid Documents may be obtained. If shipping of Bid Documents is required, there is a non-refundable fee in the amount of $25.00 payable to A&D Technical Supply Co., Inc. If shipping of CD is required, there is a flat fee in the amount of $9.00 payable to A&D Technical Supply Co., Inc. Bid Documents are available PURCHASE ONLY. Do NOT return Bid Documents, as no deposit refund will be issued.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents