Similar Projects
Water Treatment Plant Rehabilation
Renovation
Bidding
Marshallville, GA

Coppermine Water Reclamation Facility MBR Treatment capacity Expansion
Addition
Bidding
Hiram, GA 30141

Hightower Water Treatment Plant Expansion
Renovation
Post-Bid
Dawsonville, GA

Shoal Creek Wastewater Treatment Plant Central
Post-Bid
Griffin, GA

Interstate Centre Wastewater Treatment Facility And Las Expansion
Results
Richmond Hill, GA

Aragon 170,000 Gpd Wastewater Treatment Belt Press And Building
Results
Less than $748,665 est. value
Cedartown, GA

Water Treatment Plant Improvements
Renovation
Bidding
Lincolnton, GA

Water Treatment Plant Expansion Membrane Procurement
New Construction
Post-Bid
GA

Water Treatment Plant #1 Aerator Replacement
Results
Kingsland, GA 31548

Fowler Water Reclamation Facility Phase II Expansion
Addition
Bidding
$150,000 est. value
Cumming, GA 30040

Riverside Drive WTP FY2022 Basin Coatings Project
Renovation
Post-Bid
Gainesville, GA 30501

Canton Wastewater Treatment Plant Expansion to 6-MGD
Results
$63,789,100 est. value
Marietta, GA 30066

Construction of the Rocky Creek WWTP Final Clarifier #5 Project
New Construction
Bidding
Macon, GA 31208

AWTP Chlorine Scrubber System
Renovation
Post-Bid
Macon, GA 31211

Water Treatment Plant - Division 1
Results
Warner Robins, GA

Reported 04/22/2022 12:00 AM
Project Title

I-85 Water Reclamation Facility - Major Equipment and Services

Physical Address View project details and contacts
City, State (County) Jefferson, GA   (Jackson County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents