Similar Projects
Center Street Wastewater Treatment Plant Headworks Rehabilitation Project
Renovation
Bidding
Less than $2,168,000 est. value
Mount Pleasant, SC 29465

Murrells Inlet Waste Water Treatment Plant Flowing Aerator
Post-Bid
Murrells Inlet, SC

Highway 38 Well and Treatment Plant
Post-Bid
Bennettsville, SC

Mauldin Road WRRF Polymer Feed System Modifications
Results
Greenville, SC

Adkins Water Treatment Plant Filter Gallery Rehabilitation
Results
$2,000,000 to $2,500,000 est. value
Six Mile, SC 29682

Breezy Hill/Charles A. Hilton Water Treatment Plant Expansion and Improvements
Addition
Construction
$2,000,000 est. value
Graniteville, SC

Clearwater Finishing Industrial Wwtp Demolition And Closure
Demolition
Construction
$800,000 est. value
Clearwater, SC

Lake Murray Water Treatment Plant Filter 6 Addition
Post-Bid
$1,000,000 est. value
Lexington, SC 29072

Additions to Existing Water Treatment Plant
Addition
Results
McCormick, SC

Plum Island WPCP Phase 4 Capital Improvements Project
Post-Bid
$50,000,000 to $65,000,000 est. value
Charleston, SC 29401

Water Pollution Control Plant Improvement
Results
McCormick, SC

Waccamaw Neck WTP Filter Valves Replacement
Post-Bid
Pawleys Island, SC 29585

Water Treatment Plant Basin Rehabilitation Project
Results
$350,000 est. value
Union, SC 29379

Waccamaw Neck WTP Flocculator Replacement Project
Post-Bid
Pawley's Island, SC

Lake Murray WTP Filters No. 1 and No. 2 Rehabilitation
Results
$518,046 est. value
West Columbia, SC 29212

Last Updated 02/16/2021 10:25 AM
Project Title

Upper Wastewater Treatment Plant Aeration Improvements

Physical Address View project details and contacts
City, State (County) Saint George, SC 29477   (Dorchester County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes but not limited to the construction and installation of approximately 251 LF of new 6-foot wide catwalk, relocation of electrical and all piping, extension of appropriately 230 LF of new 1-inch non-potable water line and associated work necessary to render the facilities complete and operational. All work shall be as described or implied in the Specifications and indicated on Contract Drawings.

Details

Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents