Similar Projects
2020 Asphalt Materials
Term Contract
Post-Bid
Lake Zurich, IL 60047

Gravel for Midewin
Post-Bid
Wilmington, IL 60481

Supply and Delivery of FILL STONE materials to the Burns Waterway Harbor in Portage, Indiana with an Option to furnish and deliver said materials to the Chicago Harbor Stone Storage Dock in Chicago, IL
Results
Chicago, IL

Aggregate CA-16 Crushed Gravel
Results
Less than $28,795 est. value
Flora, IL

Seal Coat Aggregate
Post-Bid
Less than $41,736 est. value
Shabbona, IL 60550

215 Gallon Bituminous Materials Prime Coat Furnish and Apply
Results
Bridgeport, IL

Reseal BMG; Double Seal BMG
Post-Bid
Christopher, IL

Sealcoat & Aggregate
Results
Divernon, IL 62530

RRR Stone, Gravel and Limestone
Term Contract
Post-Bid
Lisle, IL

Bituminous Materials
Results
Less than $45,161 est. value
Smithton, IL

Multi-Year Contract for Aggregate Materials and Spoils Disposal
Term Contract
Post-Bid
Des Plaines, IL 60016

Seal Coat Work
Results
Colchester, IL 62326

Bulk Rock Salt
Post-Bid
Bloomington, IL 61701

2020 Aggregate Shoulder Improvements
Results
Bannockburn, IL 60015

Aggregate, Bituminous Patching Materials, Liquid Asphalt, Pipe Culverts
Term Contract
Post-Bid
Norwood, IL 61604

Last Updated 09/24/2021 03:44 PM
Project Title

Bituminous Materials

Physical Address View project details and contacts
City, State (County) Waterloo, IL   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $165,252
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Bituminous Materials (Tack Coat) - 3141 POUND 2. Hot-Mix Asphalt Surface Removal-Butt Joint - 462.8 SQ YD 3. Hot-Mix Asphalt Surface Course IL - 9.5 Mix "D" N70 - 586 TON 4. Incidental Hot-Mix Asphalt - 56.9 TON 5. Hot-Mix Asphalt Removal 1 1/2" - 5439 SQ YD 6. Strip Reflective Crack Control Treatment - 1000 FT 7. Mobilization - 1 L SUM 8. Short Term Pavement Marking - 564 FT 9. Short Term Pavement Marking Removal - 187.8 SQ FT 10. Temporary Pavement Marking-Line 4" - 11,280 FT 11. Thermoplastic Pavement Marking-Line 4" - 11,280 FT 12. Thermoplastic Pavement Marking-Line 24" - 30 FT 13. Traffic Control and Protection (Special) - 1 L SUM 14. Temporary Pavement Marking Removal - 3760 SQ FT 15. Portland Cement Concrete Surface Removal 1" - 1308 SQ YD

Details

Division 32 - Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents