Similar Projects
Kettle Cove State Park Redevelopment - Maine Department of Agriculture Conservation and Forestry
Renovation
Conception
$50,000,000 est. value
Cape Elizabeth, ME 04107

Portland High School Roof - Phase 1 (Partial Funding of Phase 1) - City of Portland
Renovation
Conception
$1,800,000 CJ est. value
Portland, ME 04101

Stroudwater Apartments
New Construction, Infrastructure - 45,000 SF
Design
$13,000,000 CJ est. value
Westbrook, ME 04092

Carr Woods
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Cape Elizabeth, ME 04107

Raymond Park Fountain Repair
Infrastructure
Bidding
$15,000 CJ est. value
Lewiston, ME 04240

Raymond Park Fountain Repair
Infrastructure
Bidding
$15,000 CJ est. value
Lewiston, ME 04240

2022 Bond - School Construction Projects - Cape Elizabeth School Department
New Construction, Infrastructure
Post-Bid
$115,900,000 CJ est. value
Cape Elizabeth, ME 04107

2022 Bond - School Construction Projects - Cape Elizabeth School Department
New Construction, Infrastructure
Post-Bid
$115,900,000 CJ est. value
Cape Elizabeth, ME 04107

Hudson Bus Site Playing Field
New Construction
Results
Lewiston, ME

Fairview School Bathroom Renovations and Washburn School Re-Roof Project
Renovation, Alteration
Results
Auburn, ME

Stevens Square at Baxter Woods Apartments / Portland
New Construction, Infrastructure
Construction
$60,800,000 CJ est. value
Portland, ME 04103

Summit Community Church
New Construction, Infrastructure - 28,000 SF
Pending Verification
$8,000,000 CJ est. value
Gorham, ME 04038

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Pending Verification
$825,000 CJ est. value
Lewiston, ME 04240

MPI DOT Paving Stevens Avenue - City of Portland
Infrastructure
Conception
$450,000 CJ est. value
Portland, ME 04103

Highland Avenue Land Reclamation
Infrastructure
Design
Scarborough, ME 04074

Last Updated 09/28/2022 11:39 AM
Project Title

$UPDATE PRESS - Mount Ararat High School - Arthur C. Dudley Construction

Physical Address View project details and contacts
City, State (County) Topsham, ME 04086   (Sagadahoc County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $60,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project ID: 4205487 TOPSHAM As the school year begins to wind down and students start to look to summer, Maine School Administrative District 75 took time Thursday to look to the future. The football field at Mt. Ararat High School was the scene for a groundbreaking ceremony of the new high school, set to open in 2020. School department officials, board members, and project engineers reflected on the work it took to get to this point, and celebrate a new high school for the district. "The four towns of MSAD 75 are truly unique and truly remarkable," said Superintendent Brad Smith. "That's due to the people who live and work here." Smith acknowledged those who worked to make the project a reality, including members of the school board and building committee, as well as local officials. Smith also acknowledged Mt. Ararat High School Principal Donna Brunette's work. "Donna Brunette, I don't know how someone runs a high school under normal circumstances and the last few years have been anything but normal," Smith said. "Donna has just kept things together and moving forward." Smith also noted that when residents are asked what they look for in a community, good schools are usually at the top of the list, a sentiment echoed by Building Committee Co-Chairman David A. Johnson. "More than anything we've tried to listen," he said. "We've tried to listen to the students, we've tried to listen to the staff. "Most importantly, we've tried to listen to the community as to what they valued to have in this school," Johnson added. "They, I believe, have shown their support in the way they've showed up to public hearings, the way they showed up at straw polls, and the way they supported us at the ballot box." Thursday's speakers were optimistic about the future of the project. "It's something we can all be proud of, to be within budget, hopefully we stay within budget. We'll all be working hard to make sure that happens," said Building Committee Co-Chairman John Hodge. "It's an incredible amount of work that went in to this, I'm looking forward to throwing some dirt here." Voters approved the $60 million project in March 2017, as well as a $649,000 artificial turf field. The new school will be built on the current athletic field and construction will begin once the school year is over.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents