Similar Projects
New 30,000 Gallon Draft Pit
Bidding
Valdosta, GA 31606

Bypass Pump Station And Force Main Alternate Route
Bidding
GA

Contract A - Well and Chemical Feed Building
Post-Bid
Fort Valley, GA 31030

One Portable Diesel Pump
Post-Bid
Valdosta, GA 31603

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

Wastewater Flow Measurement Stations
Results
Covington, GA 30016

Well Maintenance
Term Contract
Post-Bid
Savannah, GA 31401

Pond Springs Road Test Well with Production Option
Results
Chickamauga, GA

Wet Well Cleaning and Disposal
Term Contract
Post-Bid
Gainesville, GA 30501

Primary Chill Water Pumps Replacement
Results
Savannah, GA

Harbins Park Well Services
Post-Bid
Dacula, GA 30019

FY20 - New Flygt Pump for Wastewater Treatment Plant
Results
Douglas, GA 31533

2020 Water System Improvements - Andrews Well 2
Post-Bid
Carnesville, GA 30521

12v 1-1/2 Submersible Water Pump Department of Public Works
Results
GA

Deep Well and Chemical Feed Building
Post-Bid
Less than $600,000 est. value
Pavo, GA 31778

Last Updated 04/05/2021 09:03 AM
Project Title

Buddy Spann Park Well No. 5 (105)

Physical Address View project details and contacts
City, State (County) Hazlehurst, GA   (Jeff Davis County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of furnishing all materials, equipment and labor for the construction of: Construction of a 1,000 gallons per minute potable water well approximately 900 feet deep, well house including chemical feed systems, and 625 linear feet of 12-inch water line and all appurtenances.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents