Similar Projects
Margaret Pollard Expansion - Chatham County
Addition, Demolition, Infrastructure
Conception
$400,000 CJ est. value
Chapel Hill, NC 27516

Apartments at Midtown Improvements
Renovation
Conception
$3,000,000 CJ est. value
Chapel Hill, NC 27514

ArtsCenter
Renovation, Infrastructure - 17,864 SF
Design
$3,000,000 CJ est. value
Carrboro, NC 27510

Murray Hill at Meadowmont - Buildings 3 and 4
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Chapel Hill, NC 27517

Campus Wide Parking Repairs
Infrastructure
Bidding
$2,000,000 CJ est. value
Chapel Hill, NC 27516

FY23 Gravity Sewer Rehabilitation Package No. 11
Infrastructure
Bidding
$300,000 CJ est. value
Chapel Hill, NC 27516

Janitorial Services for Parks and Recreation Department
Term Contract
Post-Bid
Chapel Hill, NC 27516

West Rosemary Street Office and Apartments
Demolition, New Construction, Infrastructure - 4,034 SF
Post-Bid
$1,500,000 CJ est. value
Chapel Hill, NC 27516

Water Meter Vault Replacements at Royal Park and University Lake
Infrastructure
Results
$366,345 CJ est. value
Carrboro, NC 27510

Chapel Hill Transit Bus Stop Improvements
Infrastructure
Results
$592,630 CJ est. value
Chapel Hill, NC 27516

Harris Teeter #297
Renovation - 35,595 SF
Construction
$1,000,000 est. value
Carrboro, NC 27510

The 203 Project / Carrboro - BP500 Prequalification
New Construction, Infrastructure
Construction
$26,071,297 CJ est. value
Carrboro, NC 27510

Greensboro Street Mixed-Use Development
New Construction, Infrastructure - 16,186 SF
Pending Verification
$10,000,000 CJ est. value
Carrboro, NC 27510

Greensboro Street Mixed-Use Development
New Construction, Infrastructure - 16,186 SF
Pending Verification
$10,000,000 CJ est. value
Carrboro, NC 27510

Plumbing Repairs - 10075 - Orange County
Renovation
Conception
$2,208,000 CJ est. value
Hillsborough, NC 27278

Last Updated 07/26/2023 09:37 AM
Project Title

St. Paul Village

Physical Address View project details and contacts
City, State (County) Chapel Hill, NC 27516   (Orange County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Religious/Funeral, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Fitness Center, Religious Facility, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Seeking Zoning Variances, Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $148,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a mixed-use development that includes 100 independent senior living units, 250 apartment units, a worship center, multipurpose center that would consist of classrooms, event space and business/office areas, and a recreational facility that would consist of a gymnasium and fitness room. As of July 26, 2023, this project is in the early planning stages, and development plans have been submitted for review to the Town of Chapel Hill. Information regarding the selection of an architect has not been provided. Bidding for a general contractor is expected to start in the spring of 2024. A firm timeline has not been announced, however, construction is unlikely to begin prior to summer of 2024.

Details

,, 173,253 SF - 3 Stories Above Grade, 49,015 SF. 5 Stories Above Grade, 62,533 SF. 3 Stories Above Grade, 23,520 SF. 2 Stories Above Grade, 7,850 SF. 2 Stories Above Grade, 30,335 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Casework, Specialty Casework, Religious Casework, Rugs and Mats, Office Furniture, Fixed Audience Seating, Pews and Benches, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents