Similar Projects
2022 Bond - Proposition A - Seguin Independent School District
Addition, Demolition, New Construction, Renovation, Infrastructure
Conception
$135,000,000 CJ est. value
Seguin, TX 78155

Cordova Rd
Infrastructure
Conception
$22,256,128 CJ est. value
Seguin, TX 78155

Loop 1604 and I-10 Interchange - Texas Department of Transportation
Infrastructure
Design
$1,360,000,000 CJ est. value
Schertz, TX 78154

La Quinta Inn & Suites by Wyndham Seguin / EV Charging Stations
New Construction, Infrastructure - 250 SF
Design
$150,000 CJ est. value
Seguin, TX 78155

Improvements Dove Song Unit 2
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Kingsbury, TX 78638

Improvements Dove Song Unit 2
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Kingsbury, TX 78638

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

November 2021 Bond Program/
New Construction, Infrastructure
Post-Bid
$80,000,000 CJ est. value
Seguin, TX 78155

Homestead Water Line Project
Infrastructure
Results
$2,000,000 est. value
Marion, TX

2022 City Wide Striping Program
Infrastructure
Results
$188,838 CJ est. value
Selma, TX 78154

Widen Road - Add Lanes - IH 10
Infrastructure
Construction
$125,021,001 CJ est. value
Seguin, TX 78155

Dutch Bros Coffee / Seguin
New Construction, Infrastructure - 950 SF
Construction
$650,000 CJ est. value
Seguin, TX 78155

Starbucks - I-35 & North Walters Street
New Construction, Infrastructure - 2,556 SF
Pending Verification
$474,450 CJ est. value
Schertz, TX 78154

United Alloy / Phase 2
Addition, Demolition, Infrastructure - 110,423 SF
Pending Verification
$10,000,000 CJ est. value
Seguin, TX 78155

FM 1103
Infrastructure
Conception
$33,711,690 CJ est. value
Cibolo, TX 78108

Last Updated 04/02/2023 11:34 PM
Project Title

Carrizo Groundwater Supply Project Wellfield and Transmission Main Surface Facilities

Physical Address View project details and contacts
City, State (County) Seguin, TX 78155   (Guadalupe County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2021
Bids Due View project details and contacts
Estimated Value $32,494,508 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally includes the following work: 1. Site clearing and right-of-way preparation 2. Installation of Erosion and Sedimentation Controls, Tree Protection, and Site Restoration 3. Review and condition confirmation of existing access roads and well pad sites 4. Construction of a Flexible Base Wellfield Access Road 5. Installation of all at grade facilities to withdraw groundwater from seven (7) existing groundwater wells. Groundwater wells were previously constructed to approximately 1,200-ft deep, using 20-inch diameter casing and 12-inch diameter pipe-based well screens. At grade facilities include: a. Vertical turbine pumps and motors b. Concrete pump pad and associated building pads c. 12-inch and 16-inch diameter discharge piping and valves d. Associated electrical and instrumentation infrastructure, housed within a pre-fabricated building e. Installation of seven (7) generator sets for automatic switch-over upon power loss f. General grading, ground cover improvements, and perimeter fencing at each well site. 6. Installation of 12-inch, 16-inch, and 30-inch diameter PVC DR-18 raw water transmission main and associated valves and appurtenances. 7. Installation of direct bury fiber optic communications cable from each well site, terminating at the proposed water treatment plant site. Questions will only be able to be asked until 6/3/2021 4:00:00 PM CST The Anticipated Award date should read June 18, 2021. Questions no longer allowed

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents