Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

South Phase - Gantzel Road Phase Ii Extension:Combs To Queen Creek Wash - Cp0518 - City Of Mesa
Alteration
Conception
$1,179,899 est. value
Mesa, AZ 85201

Dysart Road Sewer Replacement - Riley to Corral - U0045 - City of Avondale
Infrastructure
Design
$3,435,000 est. value
Avondale, AZ 85392

67th Avenue Widening - Pinnacle Peak to Happy Valley - EN00100 - City of Peoria
Infrastructure
Design
$16,704,328 CJ est. value
Glendale, AZ 85308

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

RFQ D/B - F-35A Squadron Operations Facility #6
Demolition, New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Glendale, AZ 85309

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Post-Bid
Buckeye, AZ

Festival Ranch Planning Area 2 Infrastructure Effluent Line
Post-Bid
Sun City, AZ

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Germann Road Waterline
Alteration
Construction
Queen Creek, AZ 85142

Water Main ABB: Mountain View Road to Peoria Avenue and 15th Avenue to 19th Avenue - WS85509031 - City of Phoenix
Infrastructure
Pending Verification
$6,985,315 CJ est. value
Phoenix, AZ 85028

McKellips Road Natural Gas Line: Country Club to Loop 202 - CP0221 - City of Mesa
Infrastructure
Conception
Mesa, AZ 85205

F-35 Aircraft Maintenance Unit (AMU) 6 Luke AFB, AZ
Addition, Demolition, Infrastructure, Renovation - 4,467 SF
Design
$25,000,000 CJ est. value
Glendale, AZ 85309

Mesquite Street Val Vista to Lindsay and Ka-Lo Park
Infrastructure
Bidding
$2,300,000 CJ est. value
Gilbert, AZ 85233

Last Updated 08/18/2022 03:33 AM
Project Title

RFQ - Integrated Water Masterplan

Physical Address View project details and contacts
City, State (County) Buckeye, AZ 85326   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Buckeye (City) is soliciting RFQ's from Engineering firms to review and update the City's 2017 Integrated Water Master Plan (IWMP) and the City's 2020 Water Resources Master Plan and incorporate them into one comprehensive integrated water, wastewater, and reclaimed water digital master plan (2023 Comprehensive Water Master Plan). The consultant will complete the following tasks for the Integrated Water Masterplan. The Master Plan should include GIS layers and dashboards that are easily updated by City personnel and through the use of automated data collection. The Master Plan is expected to be based on an integrated approach to management of water, wastewater, and reclaimed wastewater systems and to build upon earlier planning and CIP efforts. The Master Plan should identify system reliability, redundancy, and areas of concern. The Master Plan should address facility needs; local and regional groundwater and surface water supplies; water and wastewater quality; water treatment and distribution; brine management and disposal; wastewater collection, pumping, and treatment; and reclaimed water reuse and recharge. The planning effort is expected to be comprehensive in that existing facilities and assets, anticipated developer-funded projects, and CIP-funded projects will be identified and mapped. The Master plan will produce a prioritized list of capital improvement and operations & maintenance (O&M) projects that can be used to formulate a 10-year Capital Improvement Plan (CIP) budget. Each identified project should include an accurate scope, detailed cost estimate, project triggers, and construction timeframes. The audience for the Master Plan is City Council, City employees, the public, consulting engineers, and the development community. All questions regarding this Statement of Qualifications are to be addressed in writing or by email to: Melissa Arreola Finance Department Third Floor, City Hall 530 East Monroe Avenue Buckeye, Arizona 85326 Email: marreola@buckeyeaz.gov The method of contractor selection has not been determined at this time

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents