Similar Projects
Route 82 Safety Improvement Phase 2 - Connecticut Department of Transportation
Infrastructure
Conception
$20,400,000 CJ est. value
Norwich, CT 06360

Route 82 Safety Improvement Phase 1 - from Banas Court to Fairmont Street, City of Norwich - Connecticut Department of Transportation
Infrastructure
Conception
$20,000,000 CJ est. value
Norwich, CT 06360

National Coast Guard Museum
New Construction, Infrastructure - 80,000 SF
Design
$100,000,000 CJ est. value
New London, CT 06320

Breeze Car Wash
Demolition, New Construction, Infrastructure - 3,050 SF
Design
$700,000 CJ est. value
Waterford, CT 06385

Griswold Sewer Extension Project
Infrastructure
Bidding
$1,163,000 CJ est. value
Griswold, CT 06351

Water Infrastructure Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Griswold, CT 06351

National Coast Guard Museum (NCGM) - Bulkhead and Fill
Infrastructure
Post-Bid
$1,000,000 CJ est. value
New London, CT 06320

Rehabilitation & Lead Paint Hazard Control Program
Term Contract, Renovation, Infrastructure
Post-Bid
$40,000 CJ est. value
Norwich, CT 06360

Water Street at Ferry Street and Governor Winthrop Boulevard Traffic Signal Improvements
Infrastructure
Results
$891,405 CJ est. value
New London, CT 06320

Library Planter and Retaining Wall Repairs
Infrastructure
Results
$110,000 CJ est. value
Groton, CT 06340

The Great Wolf Lodge at Mashantucket
Demolition, New Construction, Infrastructure - 90,000 SF
Construction
$300,000,000 CJ est. value
Ledyard, CT 06338

New London Community Recreational Center
New Construction, Infrastructure - 57,000 SF
Construction
$15,000,000 CJ est. value
New London, CT 06320

Delamar Hotel / Mystic - Revised
New Construction, Infrastructure - 29,868 SF
Pending Verification
$15,000,000 CJ est. value
Mystic, CT 06355

Oswegatchie Hills Affordable Housing
New Construction, Infrastructure
Pending Verification
$317,000,000 CJ est. value
East Lyme, CT 06333

Police Department / Waterford
Infrastructure, Renovation
Conception
$100,000 CJ est. value
Waterford, CT 06385

Last Updated 09/27/2023 09:19 AM
Project Title

Old Norwich Sewer Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) Waterford, CT 06375   (New London County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,113,850 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 27, 2023, this project has not yet been awarded. A timeline for award has not yet been established. **SEPARATE PRICING/BIDS ARE REQUIRED FOR EACH LOCATION: Old Norwich Road Pump Station 1. Construction of: a. New gas service installed by and with Eversource. b. New dry-pit submersible pumps, washwater booster pump, bypass pumping connection, piping, valves and appurtenances; c. New electrical gear and lighting; d. New HVAC system; e. Miscellaneous painting and other architectural improvements; f. Piping, equipment systems, instrumentation, control and electrical systems, as indicated on the Drawings. g. Other appurtenances as shown on the Drawings and specified herein. 2. Demolition of: a. Dry well and wet well contents including pumps, motors, piping, fittings, valves, gates, HVAC system, and associated electrical and instrumentation work; b. Piping and conduit, as indicated on the Drawings. 3. Maintain plant flow and treatment processes as detailed in Part 3 of this section and Specifications Section 01515. 4. Remove and/or relocate equipment as indicated on the Drawings. Cross Road Pump Station 1. Construction of: a. New dry-pit submersible pumps, washwater booster pump, bypass pumping connection, piping, valves and appurtenances; b. New electrical gear and lighting; c. New exterior generator; d. New HVAC system; e. New access driveway; f. Miscellaneous painting and other architectural improvements; g. Piping, equipment systems, instrumentation, control and electrical systems, as indicated on the Drawings. h. Other appurtenances as shown on the Drawings and specified herein. 2. Demolition of: a. Underground 1,000-gallopn diesel storage tank; b. Dry well and wet well contents including pumps, motors, piping, fittings, valves, gates, HVAC system, and associated electrical and instrumentation work; c. Piping and conduit, as indicated on the Drawings. 3. Maintain plant flow and treatment processes as detailed in Part 3 of this section and Specifications Section 01515. 4. Remove and/or relocate equipment as indicated on the Drawings. This project is subject to Previaling wages. This project is Tax Exempt. This project has Set Aside requirements: 25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses. All questions about the meaning or intent of the Contract Documents are to be directed to the Purchasing Agent bmoses@waterfordct.org Question Deadline 08/03/2023

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents