Similar Projects
Milwaukie / El Puente Elementary Safe Routes to School Improvements - City of Milwaukie
Infrastructure
Conception
$5,196,000 est. value
Milwaukie, OR

I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

Blue Heron 2 Trunk Sanitary Sewer Rehabilitation Project
Infrastructure
Bidding
$4,000,000 CJ est. value
Lake Oswego, OR 97034

RFP - Affordable Housing Construction Grant (Construction Excise Funds)
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Milwaukie, OR 97222

Willamette Falls Locks (WFL) Seismic and Safety Upgrades
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Oregon City, OR 97045

I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Post-Bid
$30,000,000 est. value
OR

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
OR

SAFE SSMP FY21 Improvement Project
Infrastructure
Results
$3,056,000 to $3,565,000 est. value
Milwaukie, OR

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

162nd Avenue Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

162nd Avenue Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Waluga Pressure Zone Pipe Resiliency Improvements: (R- 01) - City of Lake Oswego
Infrastructure
Conception
$1,140,000 CJ est. value
Lake Oswego, OR 97035

Last Updated 12/06/2022 09:25 AM
Project Title

Oregon City View Manor Public Housing Striping Project

Physical Address View project details and contacts
City, State (County) Oregon City, OR 97045   (Clackamas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $11,750 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Address: 200 S. Long View Way, Oregon City, Oregon. 97045 (To include Aldrich Ct.). LOT # 1 - Parking lot cleaning: - Pressure wash all painted curbs, crosswalks, speed bumps, stall lines, numbering to prep for striping, as well as moss on asphalt to ensure proper paint adhesion. - Sweeper truck to collect spoils after pressure washing (or equivalent). - Disposal of all materials. LOT # 2 - Stripe: - Ennis heavy-duty traffic grade paint (or equivalent). - Sweeper truck to clean areas prior to striping (or equivalent). - Paint parking stalls, ADA's, speed bumps, crosswalks (stencils), numbers (at rear of stalls (not curb) and all curbs as existing. - Striping to be completed in 3-6 mobilizations. - Attached to this bid package is a form called Maintenance Wage Rate Determination - Non Routine Maintenance. These wage rates (Basic Wage plus Fringe Wage) that are applicable to this project shall be paid by the contractor to the employee(s) working only on HACC properties/projects. These wage rates (Basic Wage plus Fringe Wage) shall be included in the pricing above on labor/install type work. - In order to meet HUD's procurement and wage requirements, HACC has implemented procedures to meet these requirements. These procedures may include one or more of the following: Onsite wage interviews for work performed, submitting HUD certified payroll for work performed, and/or requests to provide/submit paystubs or timecards to show hourly rate paid for work performed. If contractor/vendor has any questions about these wage requirements/procedures please contact HACC prior to bid date and time. Est. $10-$15K. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The vendor shall provide all labor and materials necessary to perform the following unless specified. Subject: Oregon City View Manor Public Housing Striping Project

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents