Croom High School HVAC Modernization
Bidding
Cheltenham, MD 20623

Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Indoor Air Quality Services
Term Contract
Post-Bid
Upper Marlboro, MD

Maya Angelou French Immersion School HVAC Upgrade
Results
Temple Hills, MD

John S. Toll Physics Infrastructure Piping University of Maryland College Park
Results
College Park, MD

Fort Foote Elementary School - Univent Replacement and Windows and Doors Replacement
Post-Bid
Fort Washington, MD 20744

HVAC Services
Results
Hyattsville, MD

Tayac Elementary School - HVAC Replacement
Post-Bid
$3,000,000 to $4,000,000 est. value
Fort Washington, MD 20744

Thurgood Marshall Library HVAC Renovation Project
Results
Bowie, MD

Robert Goddard Montessori School - HVAC Replacement and Building Envelope
Post-Bid
Seabrook, MD 20706

HVAC Maintenance and Service
Term Contract
Results
Less than $50,000 est. value
Upper Marlboro, MD 20772

J.E. Proctor Building Chiller Replacement
Post-Bid
Bowie, MD 20715

HVAC Maintenance and Service
Term Contract
Results
Less than $50,000 est. value
Greenbelt, MD

HVAC Maintenance and Repair at Cheltenham Youth Center
Post-Bid
Cheltenham, MD 20623

Portable Air Conditioning Preventative Maintenance and Repairs
Results
Berwyn Heights, MD 20740

Last Updated 12/20/2018 09:05 AM
Project Title

HVAC Equipment Replacement for College Park Youth and Family Services Facility

Physical Address View project details and contacts
City, State (County) College Park, MD 20740   (Prince Georges County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description A Work consists in replacing existing air handlers with new high efficiency natural gas fired furnaces and high efficiency air cooled condensing units. B Removal of all existing air handlers, boiler and condensing units and other electrical/ mechanical equipment supporting existing equipment to be removed. Remove all hot water piping feeding existing Air Handlers. C Replacement of existing condensing units and air handlers with new high efficiency gas furnaces and matching condensing units minimum 14 SEER. See appendix for HVAC new Split System schedules. D Installation of new auto controls for operation of new furnaces split systems. Thermostats to be programmable 7 day type with back-up battery. Remove all existing Thermostats and replace with new. E Repair and perform all the necessary work required to return to original condition all the building walls, floors and doors removed with the purpose of introducing or removing equipment from building. F Provide new gas piping for new high efficiency furnaces. See riser diagram which is part of the Appendix. G Re-use refrigerant piping. Provide flushing and cleaning of existing refrigerant piping as approved by manufacturer of condensing units. H Provide condensate pump for each of the new furnaces equal to Little Giant Pump. See Appendix. I Provide condensate water neutralizer Rinnai Model 804000074 for each furnace. See Appendix. J Provide carbon monoxide detector for each HVAC zone. K Provide flue for each furnace for intake and exhaust of sizes approved by furnace manufacturer. L Reconnect existing Fresh Air Intake Ducts to all new Gas Fired Furnaces. M Provide air (CFM) balance reading for supply duct cross section for each new furnace installed. Provide report for owner review and records.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents