Similar Projects
New Drinking Water Well - City of Woodstock
New Construction, Infrastructure
Conception
$1,750,000 CJ est. value
Woodstock, IL 60098

Southern Service Area Lift Station - 19-PWSew-002 - Village of Huntley
Infrastructure
Conception
$2,850,000 CJ est. value
Huntley, IL 60142

Residences of Fox Meadows
New Construction, Infrastructure
Design
$205,000,000 CJ est. value
Nunda Township, IL 60050

Residences of Fox Meadows
New Construction, Infrastructure
Design
$205,000,000 CJ est. value
Nunda Township, IL 60050

Reconstruct Souwanas Trail
Infrastructure
Bidding
$5,907,383 CJ est. value
Algonquin, IL 60102

Reconstruct Souwanas Trail
Infrastructure
Bidding
$5,907,383 CJ est. value
Algonquin, IL 60102

Knox Park Parking Lot Rehabilitation
Infrastructure
Post-Bid
McHenry, IL

Phase III Construction Engineering Services for North Main Street Improvement
Infrastructure
Post-Bid
Crystal Lake, IL 60014

School Road Resurfacing
Infrastructure
Results
Ringwood, IL

McCullom Lake Road Improvements
Infrastructure
Results
McCullom Lake, IL 60050

Reconstruct the Intersection of Madison Street, South Street, and Lake Avenue
Infrastructure
Construction
$27,554,453 CJ est. value
Woodstock, IL 60098

Reconstruct the Intersection of Madison Street, South Street, and Lake Avenue
Infrastructure
Construction
$27,554,453 CJ est. value
Woodstock, IL 60098

AZE Distribution Center
New Construction, Infrastructure - 175,600 SF
Pending Verification
$19,000,000 CJ est. value
Huntley, IL 60142

Enclave Apartments and Town Homes
New Construction, Infrastructure - 7,100 SF
Pending Verification
$20,000,000 CJ est. value
Crystal Lake, IL 60014

Huntley-Dundee Sanitary Sewer Replacement - 22-PWSew-004 - Village of Huntley
Infrastructure
Conception
$275,000 CJ est. value
Huntley, IL 60142

Last Updated 02/14/2023 10:34 AM
Project Title

2023 Sidewalk Replacement Program

Physical Address View project details and contacts
City, State (County) Woodstock, IL 60098   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $85,395 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work described in these specifications consists of performing Sidewalk Removal and Replacement following the requirements of the Standard Specifications for Road and Bridge Construction published by the Illinois Department of Transportation (IDOT), January 1, 2022, hereafter referred to as the "Standard Specifications". The City of Woodstock will receive sealed bids for its 2023 Sidewalk Replacement Program consisting of Sidewalk Removal and Replacement following the requirements of the Standard Specifications for Road and Bridge Construction published by the Illinois Department of Transportation (IDOT), January 1, 2022, hereafter referred to as the "Standard Specifications" in various areas within City limits Award of the bid will be considered at a later meeting of the Woodstock City Council within at least 30 days of the date of receiving bids. Only bids and proposals submitted on forms prepared by the City of Woodstock will be considered. All bids received prior to the specified date and time, which meet or exceed the minimum specifications, will be considered by the City. The City will review each properly submitted bid and will make a selection based upon price, availability, quality and other features of the bid proposals. Not less than the prevailing rates of wages as found by the City of Woodstock and/or the Illinois Department of Labor, or determined by a court on review, shall be paid to all laborers, workmen, and mechanics performing work under this contract. The successful bidder shall comply with all requirements of the "Employment of Illinois Workers on Public Works Act", 30 ILCS 570/0.01. The City of Woodstock reserves the right to reject any or all bids, to waive irregularities in the bids, and to select the bid that is considered to be the most advantageous to the City of Woodstock.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents