Similar Projects
Beach Erosion Control and Hurricane Protection Project Bal Harbour Beach Renourishment 2020 Miami-Dade County, Florida
Bidding
$10,000,000 to $20,000,000 est. value
Miami, FL

CDBG Drainage Improvements and Water Main Installation
Bidding
$1,971,586 est. value
FL

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

Sweetwater Drainage Improvements: Phase 8A
Post-Bid
Sweetwater, FL 33174

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Drainage Improvements Multiple Sites
Results
Less than $366,769 est. value
FL

South Miami-Dade Salt Intrusion Barrier Project
Post-Bid
Less than $500,000 est. value
Miami, FL 33128

Canal Bank Stabilization Program: Year 7
Results
Less than $2,250,000 est. value
Doral, FL 33166

Madeleine Village Apartments Seawall Replacement
Post-Bid
Less than $530,000 est. value
Miami Beach, FL 33139

Drainage Improvements Multiple Sites
Results
Less than $549,382 est. value
Miami, FL 33128

Design and Construction of Concrete Hurricane-Resistant Screen Wall at Miami Job Corps Center
Post-Bid
$250,000 to $500,000 est. value
Miami Beach, FL 33056

Rickenbacker Causeway Drainage Improvement
Results
Less than $75,000 est. value
Miami, FL 33128

Florida City Canal Outfall and Equalizer Improvements Project
Post-Bid
Less than $989,000 est. value
Miami, FL 33128

Drainage Improvements Multiple Sites
Results
Less than $335,886 est. value
Miami, FL 33134

Continuing Services (as Needed) for the Construction of Seawalls Citywide
Term Contract
Post-Bid
Less than $1,500,000 est. value
Miami, FL 33139

Reported 06/17/2020 12:00 AM
Project Title

Arcola Lakes - Bioretention Area

Physical Address View project details and contacts
City, State (County) Miami, FL 33147   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $98,000
Plans Available from County Agency - 05/29/20
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor and materials required for the construction Construct a bioswale, adjecent porous paving, weir, and signage.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents