Similar Projects
FY24 Detention Center Facility Assessment Renovation And Repair - Buncombe County
Renovation
Conception
$440,000 CJ est. value
Asheville, NC 28801

Chatham County Detention Center Generator - Chatham County
Renovation
Conception
$627,738 CJ est. value
Pittsboro, NC 27312

Cabarrus County Jail Housing Mezzanine Modifications
Renovation
Design
Concord, NC 28025

New Detention Center
New Construction - 55,000 SF
Design
$18,000,000 to $23,000,000 est. value
Mocksville, NC

Program Visitor Building Accessibility
Infrastructure, Build-out, Renovation
Bidding
$750,000 CJ est. value
Winston Salem, NC 27105

RFQ Contractor Federal Correctional Institution 2 (FCI 2) Butner - Replace Roofs
Renovation
Bidding
$10,000,000 CJ est. value
Bahama, NC 27503

Design-Build - Union County Jail Facility Renovations
Renovation
Post-Bid
$500,000 est. value
Monroe, NC 28112

Painting, Power Washing and General Building Envelope Repairs at Durham County Detention Facility
Renovation
Post-Bid
$219,000 CJ est. value
Durham, NC 27701

Nash County Detention Facility Renovation And Addition
Renovation, Addition - 29,075 SF
Results
NC

Detention Centers Modernization Project
Renovation
Results
NC

Detention Center
Renovation - 80,354 SF
Construction
Dobson, NC

Perquimans Juvenile Detention Center - Renovation
Renovation - 8,460 SF
Construction
$4,348,300 CJ est. value
Hertford, NC 27944

RFQ Contractor - Detention Center Expansion
Addition, Demolition, Infrastructure - 33,000 SF
Post-Bid
$16,500,000 CJ est. value
Waynesville, NC 28786

RFQ Construction Manager at Risk - Jail Expansion
Addition, Demolition, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Lincolnton, NC 28092

RFQ Construction Manager at Risk - Jail Expansion CMR
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
Lincolnton, NC 28092

Last Updated 05/01/2023 10:34 AM
Project Title

Sampson Correctional Institution Enterprise Laundry Fire Repairs Renovation Package

Physical Address View project details and contacts
City, State (County) Clinton, NC 28328   (Sampson County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

NOTE: The bidder shall identify on its bid proposal the minority business participation it will use on the project (Identification of Minority Business Participation) form and shall include either Affidavit A or Affidavit B as applicable. Forms and instructions are included within the Proposal Form in the bid documents. Failure to complete these forms is grounds for rejection of the bid. (GS143-128.2c Effective 1/1/2002.) All contractors are hereby notified that they must have proper license as required under the state laws governing their respective trades. General contractors are notified that Chapter 87, Article 1, General Statutes of North Carolina, will be observed in receiving and awarding general contracts. General contractors submitting bids on this project must have license classification for Building Contractor-Unlimited Under GS 87-1, a contractor that superintends or manages construction of any building, highway, public utility, grading, structure or improvement shall be deemed a "general contractor" and shall be so licensed. Therefore, a single prime project that involves other trades will require the single prime contractor to hold a proper General Contractors license. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company, insured by the Federal Deposit Insurance Corporation, of an amount equal to not less than five percent (5%) of the proposal, or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina to execute the contract in accordance with the bid bond. Said deposit shall be retained by the owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten days after the award or to give satisfactory surety as required by law. A performance bond and a payment bond will be required for one hundred percent (100%) of the contract price. Payment will be made based on ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of 60 days. The owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents