Last Updated 06/30/2021 09:48 AM
Project Title

Lemm Gully Slope Stabilization at Sanitary Sewer Crossing

Physical Address View project details and contacts
City, State (County) Houston, TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves stabilizing the Lemm Gully banks by using H Piles and treated pine board lagging. Stabilizing the existing banks and erosion control measures are required to rebuild the soils surrounding the existing sanitary line and protect the gully banks from future erosion.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents