Similar Projects
Store-It Right Storage Facility / Pabst Farms Commerce Center
New Construction, Infrastructure - 122,000 SF
Design
$13,000,000 CJ est. value
Oconomowoc, WI 53066

Maple Centre - Phase 2
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Mukwonago, WI 53149

Park Recreation And Forestry Cold Storage Building - 1900 Aviation Drive
New Construction, Infrastructure - 5,900 SF
Bidding
$484,000 CJ est. value
Waukesha, WI 53188

Bike Path
Term Contract
Post-Bid
Brookfield, WI

2023 Road Program: Utility Repairs And Roadway Resurfacing Professional Services
Infrastructure
Post-Bid
Sussex, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Crackfill
Results
$100,000 est. value
Merton, WI 53056

National Heritage Academies / Waukesha
New Construction, Infrastructure - 45,000 SF
Construction
$9,500,000 CJ est. value
Waukesha, WI 53189

ABB Inc. Headquarters
New Construction, Infrastructure - 301,320 SF
Construction
$161,000,000 CJ est. value
New Berlin, WI 53146

Atlas Metals Parts Co Expansion
Addition, New Construction, Infrastructure - 4,900 SF
Pending Verification
$260,000 CJ est. value
Waukesha, WI 53186

Brookfield Square Mall
Demolition, New Construction, Infrastructure - 370,000 SF
Pending Verification
$81,000,000 CJ est. value
Brookfield, WI 53005

Maple Centre - Phase 1
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Mukwonago, WI 53149

Seal Coating
Infrastructure
Post-Bid
Merton, WI

2021 Road Program Restoration
Renovation
Results
Brookfield, WI 53005

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Last Updated 02/09/2023 12:15 AM
Project Title

North Street and West Street Paul Avenue 2-way Conversion Phase 2 - City of Waukesha

Physical Address View project details and contacts
City, State (County) Waukesha, WI 53186   (Waukesha County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2026
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In 2017, Staff had concluded a study that examined the conversion of the existing one-way pair street system to a twoway street system. The first phase of the 2-way conversion was completed in 2022 along St. Paul Avenue and North St. The second phase of the 2-way traffic conversion would include intersection improvements and geometric changes at the Moreland Blvd./E. North St./E. St. Paul Avenue intersection, including traffic signal upgrades, pavement marking changes, signing upgrades, and ADA curb ramp upgrades. This project is in included in the City of Waukesha FY 2023 - 2027 CIP. As of February 09, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents