Similar Projects
Atlantic and New England Slate Flooring
Alteration
Post-Bid
Saint Louis, MO

Armstrong Fine Fissured Flooring
Alteration
Post-Bid
Saint Louis, MO

Carpet
Term Contract
Post-Bid
Saint Louis, MO

Epoxy Floor Coating in the Engine House
Alteration
Post-Bid
Saint Louis, MO

Carpet Replacement II
Term Contract
Post-Bid
MO

Replace Rubberized Floors at Community Center
Alteration
Post-Bid
Overland, MO 63114

Resilent Flooring
Post-Bid
Saint Louis, MO

Freestyle Flooring
Alteration
Post-Bid
Saint Louis, MO

J056--Flooring Repair Services for The St. Louis VAMC-JB Division
Term Contract
Post-Bid
Bella Villa, MO 63125

Police Department Remodel - Flooring
Renovation, Alteration
Bidding
Crestwood, MO

Armstrong Fine Fissured Flooring Tile
Alteration
Post-Bid
Saint Louis, MO

Outdoor Pool Tile Restoration
Alteration
Post-Bid
Crystal Lake Park, MO 63131

Replace Damaged Tile in Patio Area
Alteration
Post-Bid
Saint Louis, MO 63101

Armstrong Fine Fissured Flooring Tile
Alteration
Post-Bid
Saint Louis, MO

Flooring Materials and Installation
Alteration
Post-Bid
MO

Last Updated 03/01/2022 09:11 AM
Project Title

Flooring Replacement

Physical Address View project details and contacts
City, State (County) Beverly Hills, Ferguson, Florissant, MO 63135   (Saint Louis County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall clean and prepare floors to satisfactorily receive new flooring, including filler as required to level floor where needed. The installation shall be an indication of contractor's acceptance of the sub-floor and he will automatically assume the responsibility for any unacceptable finished work caused by sub-floor conditions. All glue and mastic under carpet, tile or linoleum must be removed prior to installation of new flooring. All asbestos VCT removal must include VCT, mastic, cove base, linoleum and carpet if VCT is under carpet. All Flooring removal and installation of new flooring must be done during regular business hours. Contractor shall clean and prepare floors to satisfactorily receive tile and carpet installation, including filler as required to level floor where needed. The installation shall be an indication of contractor,s acceptance of the sub-floor and he will automatically assume the responsibility for any unacceptable finished work caused by sub-floor conditions.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents