Similar Projects
Highlands Drive Area Waterline Replacement
Infrastructure
Bidding
$1,444,304 est. value
Smyrna, GA 30082

Water System Improvements
Infrastructure
Bidding
$800,000 est. value
Keysville, GA

Heron Bay Force Main D
Post-Bid
Marietta, GA

Prequalification Of Contractors for The Period 2021-2022
Post-Bid
Marietta, GA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Meter Upgrade and Installation
Infrastructure
Bidding
$300,000 est. value
Nicholls, GA

Automated Metering Infrastructure
Post-Bid
Temple, GA

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

Creatwood Trail Area Waterline Replacement
Infrastructure
Bidding
$200,000 est. value
Smyrna, GA

2021 City Wide Meter Project
Post-Bid
Baxley, GA

S.R. 247 20-Inch Water Main
Results
Macon, GA 31202

Georgia War Veterans Home Site Infrastructure
New Construction, Infrastructure
Bidding
$700,000 est. value
Milledgeville, GA 31061

Water Line Relocation for State Route 32 Widening Project Extension East
Infrastructure
Post-Bid
Douglas, GA

South Annexation - GEFA Phase III Infrastructure
Results
Richmond Hill, GA 31324

Last Updated 05/27/2022 02:18 PM
Project Title

Replacement and Repair of Water Lines Annual Contract

Physical Address View project details and contacts
City, State (County) Winder, GA   (Barrow County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will include extension, renewal, replacement and repair of water lines (3/4"-24" diameter), sanitary sewer (4"-24" diameter) and storm sewer (12"-60" diameter). Bid does not include materials; there will be an allowance for the purchase of materials. Contract will last for twelve (12) months with automatic renewals for up to five (5) years total. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) contract with individual Task Orders to be issued for each separate project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents