Similar Projects
Water Meter Material and Equipment
Bidding
Gilbert, AZ 85296

Water Main Replacement Program Right-of-Way
Term Contract
Bidding
Phoenix, AZ 85003

Hamstra Dairy Val Vista Drive Public Water and Reclaimed Water Improvements
Post-Bid
Gilbert, AZ

Historic Avondale Phase I Improvements Design/Build
Post-Bid
Avondale, AZ 85323

Water Line and Gas Line Replacements
Results
$10,500,000 est. value
Mesa, AZ

Side Inlet Pipes Rehabilation, New River Levees, Olive Avenue to Grand Avenue Project
Term Contract
Results
$225,000 to $275,000 est. value
Phoenix, AZ

Water Meter Locking Devices and Meter Lid Hooks
Post-Bid
Phoenix, AZ 85003

Water Main Replacement Project
Results
Less than $943,000 est. value
El Mirage, AZ

H--Copy of Water Purification System Periodic Maintenance (PVAHCS)
Post-Bid
Phoenix, AZ 85012

Water Services Department Small Valve Replacement
Results
$2,000,000 est. value
Phoenix, AZ 85000

Madison Infrastructure Services
Post-Bid
Peoria, AZ 85345

Empire Road Water and Transmission Line
Results
Queen Creek, AZ

Backflow Prevention Assembiies Testing, Repair and Replacement
Term Contract
Post-Bid
Tempe, AZ 85281

Cloud Road Water Line and Sewer
Results
Queen Creek, AZ

Kyrene Middle School Underground Piping Replacement
Term Contract
Post-Bid
$3,200,000 est. value
Tempe, AZ 85284

Reported 01/11/2019 12:00 AM
Project Title

Construction Manager at Risk Waterline Replacement Clark, University and Daley Park Neighborhoods

Physical Address View project details and contacts
City, State (County) Tempe, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. Clark Park neighborhood, approximately the area bound by Broadway Road north to West 13th Street, and Hardy Drive east to Mill Avenue, and will include a total of approximately 4.6 miles of 6", 8" and 12" waterline replacements. 2. University Park/Estates neighborhood, approximately the area bound by the Union Pacific Railroad north to Apache Boulevard, and Mill Avenue east to Rural Road, and will include a total of approximately 2.1 miles of 6" and 8" waterline replacements. 3. Daley Park neighborhood, approximately the area bound by the Broadway Road north to the Union Pacific Railroad, and College Avenue east to Rural Road, and will include a total of approximately 3.1 miles of 6", 8" and 12" waterline replacements.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents