Similar Projects
Fire Station #7
New Construction
Conception
$7,100,000 est. value
College Station, TX

Sheriffs Office Departments Reorganization
Renovation
Conception
Midland, TX 79701

New Law Enforcement Center
Addition
Design
Mansfield, TX 76063

Police Weapons Range New Classroom Building
New Construction
Design
$630,000 est. value
Waco, TX 76708

Corpus Christi Police Training Facility (Rebid)
New Construction, Infrastructure - 32,000 SF
Bidding
$20,533,910 CJ est. value
Corpus Christi, TX 78414

El Paso Fire Department Special Operations Division Station - Capital Improvement
Renovation
Bidding
$200,000 CJ est. value
El Paso, TX 79901

City of Duncanville Fire Station #1
New Construction - 15,500 SF
Post-Bid
Duncanville, TX 75116

Fort Bend County Emergency Services District 7 - Fire Station #52
New Construction - 12,696 SF
Post-Bid
$500,000 est. value
Fresno, Rosharon, TX 77545

Inter Community Volunteer Fire Department - New Sub Station No. 2
New Construction - 2,400 SF
Results
$385,000 to $415,000 est. value
Carthage, TX 75633

Desig-Build of Montgomery County Sheriff`s Office Fifty Yard Indoor Full Tactical Range
Results
Conroe, TX 77301

Fire Station 5
New Construction - 10,000 SF
Construction
$5,300,000 est. value
The Colony, TX 75056

Fire Station #1 and Fire Prevention Building Re-build
New Construction, Demolition - 17,678 SF
Construction
$8,900,000 est. value
Arlington, TX 76010

Fire Station 4
New Construction
Pending Verification
$5,100,000 est. value
Killeen, TX

Police Training Campus
Addition
Pending Verification
$2,075,000 est. value
Temple, TX 76501

Improvements to Fire Station No. 5
Renovation
Conception
$3,000,000 est. value
Richardson, TX

Last Updated 10/17/2022 09:05 AM
Project Title

Florence Fire Station Remodel / Williamson County Emergency Service District 7 Station 1

Physical Address View project details and contacts
City, State (County) Florence, TX 76527   (Williamson County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 17 2022, this project is in the final planning stage. An architect has been selected. Information regarding a general contractor has not been disclosed. Construction can be anticipated to begin late 4Q of 2022*. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents