Similar Projects
AGO Gas Station & Convenience Store
New Construction - 4,860 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Walker, MI 49534

Prestige Home Group - Parking Lot
Addition
Design
Byron Center, MI 49315

Meadowlane Drive Reconstruction
Alteration
Bidding
$1,600,000 est. value
Kentwood, MI

Paving & Site Lighting
Post-Bid

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Water Supply System Extension Area 3 - Herrington Avenue, Sprucewood Drive, Sprucewood Court, Meek Drive, Korben Woods Court, Terrie Lynn Drive, Frond Street, Pine Hill Drive and Belmont Avenue
Results
Belmont, MI

PNC Bank Branch No. B605
Renovation
Construction
Kentwood, MI 49508

PNC Bank Branch No. B703 Cascade
Renovation
Construction
Grand Rapids, MI 49546

West Michigan Auto Glass
Addition - 2,880 SF
Pending Verification
Kentwood, MI 49548

Borgman Truck Facility
New Construction - 14,100 SF
Pending Verification
Wyoming, MI 49519

Tommy's Express Car Wash - P2266 & CARite Dealership
New Construction - 9,274 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Grand Rapids, MI 49548

Site Improvements and Extension of Existing Utilities
Infrastructure
Post-Bid
Ada, MI 49301

2.17 MI of Hot Mix Asphalt Reconstruction and Bridge Rehabilitation
Results
MI

PNC Bank Branch No. B839
Renovation
Construction
Wyoming, MI 49509

Last Updated 07/22/2022 10:09 AM
Project Title

Merle Boes Plainfield Gas Station

Physical Address View project details and contacts
City, State (County) Grand Rapids, MI 49505   (Kent County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 2022, zoning was approved August of 2021. The city of Grand Rapids has yet to issued building permits for the development. Information regarding architect or contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents