Similar Projects
Last Updated | 08/18/2022 04:03 PM |
Project Title | Wastewater Treatment Facility Headworks Repairs - 2022 |
Physical Address | View project details and contacts |
City, State (County) | Kansas City, MO 64152 (Platte County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $276,467 [brand] Estimate |
Plans Available from | Agency's Affiliate - 06/10/22 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of repairs to the Headworks facilities at the Brush Creek WWTF as follows: Temporary bypass pumping at three locations at the WWTF, concrete lining of the grit chamber and outdoor wastewater channels, replacing low pressure air piping at the grit chamber, installing a new grit removal system motor control panel, running a new feeder circuit from the existing Electrical Building, replacing conduit and wiring at the Headworks, replacing motor disconnect switches and local control stations at the Headworks, and other related items of work. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |