Similar Projects
Watermark - Fort Collins
New Construction
Conception
$7,000,000 est. value
Fort Collins, CO 80521

Watermark - Fort Collins
New Construction
Conception
$7,000,000 est. value
Fort Collins, CO 80521

Sanctuary on the Green (formerly known as Sanctuary West)
New Construction - 90,195 SF
Design
Fort Collins, CO 80521

Sanctuary on the Green (formerly known as Sanctuary West)
New Construction - 90,195 SF
Design
Fort Collins, CO 80521

Lone Tree Recreation Center Outdoor Pickleball Courts
Renovation
Bidding
$1,500,000 est. value
CO 80124

Peoria Crossing II
New Construction - 89,770 SF
Bidding
Aurora, CO 80010

Willow Bend Community
New Construction
Post-Bid
Fort Lupton, CO 80621

Willow Bend Community
New Construction
Post-Bid
Fort Lupton, CO 80621

Ellen Hansen Smith Center Rehabilitation Project
Results
Paonia, CO

Outdoor Pool Services
Results
Thornton, CO 80229

The Collins / Brick Stone on Harmony
New Construction - 202,000 SF
Construction
$10,000,000 CJ est. value
Fort Collins, CO

Apex Meridian Phase II
New Construction - 180,000 SF
Construction
$10,000,000 est. value
Lone Tree, CO

South Taft Hill Road Mixed Use Development
New Construction - 19,500 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Fort Collins, CO

Springs at Pena Station
New Construction
Pending Verification
Denver, CO 80249

Snowmass Center
New Construction - 58,433 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Snowmass Village, CO 81615

Reported 02/25/2022 12:12 PM
Project Title

Lariat

Physical Address View project details and contacts
City, State (County) Greeley, CO 80634   (Weld County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Clubhouse/Social Club, Multi-Family Homes, Swimming Pool(s)
Contracting Method
Project Status Construction Commenced December 2021, Construction Completion Expected fourth quarter 2023
Bids Due View project details and contacts
Estimated Value Greater than $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A mix of studio, one-, two- and three-bedroom units ranging in size from 599 square feet to 1,559 square feet, all with open floor plans, large closets and all major appliances included. The two townhome buildings will feature both two-and three-bedroom townhome options. The Lariat is anticipated to be completed by late Fall 2023.

Details

Multi-Family Homes, 3 Stories Above Grade, New Construction, 8 Buildings, New Construction, 304 Unit(s), Clubhouse/Social Club, 7,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Wood Framing, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment, Fabricated Engineered Structures, Fabricated Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Underwater Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents