Similar Projects
Rooted Investments Mixed Use Development
New Construction - 12,540 SF
Conception
$3,500,000 est. value
Visalia, CA 93291

Visser Apartments
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Visalia, CA 93277

Sorma USA
Addition - 12,700 SF
Design
Visalia, CA 93291

Mammoth Townhomes
New Construction, Infrastructure - 9,676 SF
Design
$1,400,000 CJ est. value
Visalia, CA 93291

City Corporate Yard Improvements
Infrastructure
Bidding
$250,000 CJ est. value
Lindsay, CA 93247

Tule River Parkway Phase III
Infrastructure
Bidding
$1,998,950 CJ est. value
Porterville, CA 93257

Springville New Public Library
New Construction, Infrastructure - 3,000 SF
Post-Bid
$2,300,000 CJ est. value
Springville, CA 93265

Rehabilitate Ash Mountain & Buckeye Wastewater Treatment Plants
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Visalia, CA 93291

Grading Peoples Basin
Infrastructure
Results
Woodlake, CA 93286

Elbow Creek Elementary Modular Site Work
Renovation, Infrastructure
Results
$450,000 est. value
Visalia, CA 93292

West Putnam Elementary School Classroom
Addition, Demolition, Infrastructure
Construction
$11,049,000 CJ est. value
Porterville, CA 93257

Pony Express / Visalia
New Construction, Infrastructure - 4,400 SF
Pending Verification
$1,000,000 CJ est. value
Visalia, CA 93291

St. George Spine and Pain Surgery Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 14,065 SF
Pending Verification
$1,000,000 CJ est. value
Visalia, CA 93277

2022 Bond / Measure Z - Farmersville Unified School District
Demolition, New Construction, Renovation, Infrastructure
Conception
$8,600,000 CJ est. value
Farmersville, CA 93223

Ben Maddox Way Apartments
New Construction, Infrastructure - 189,087 SF
Design
$52,000,000 CJ est. value
Visalia, CA 93292

Last Updated 12/27/2022 08:32 AM
Project Title

Mega3 Self Storage

Physical Address View project details and contacts
City, State (County) Tulare, CA 93274   (Tulare County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a storage facility. As of December 27, 2022, this project received CUP and entitlement approvals. A building permit application has not yet been filed. Information regarding the selection of a general contractor has not been released. A timeline has not been announced.

Details

,, 105,006 SF - 104,025 SF. 981 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents