Similar Projects
Northside Water Main Construction
Infrastructure
Bidding
$450,000 to $550,000 est. value
Sioux Falls, SD 57104

Lennox 2021 Street Improvements
Infrastructure
Bidding
$620,000 est. value
Lennox, SD

10th Avenue North Reconstruction
Post-Bid
$1,500,000 to $2,500,000 est. value
Watertown, SD 57201

South Reservoir Control Valve and Miscellaneous Flow Meter Improvements
Post-Bid
$766,000 est. value
Sioux Falls, SD 57104

Gateway Boulevard (CR106) Phase 2 Improvements
Results
Less than $14,500,000 est. value
Tea, SD 57064

2021 Douglas/Washington Streets
Results
Elk Point, SD 57025

East 1st Street Extension
Post-Bid
$4,000,000 est. value
Tea, SD 57064

Water Meter Replacement - Phase 2
Results
Brandon, SD

Replacing Existing Main Distribution Areas - Water Department and Installation of Flood Wall Berm at Pelican Sub - Electric Department
Post-Bid
Watertown, SD

Ultrasonic Meters
Results
Sioux Falls, SD

Main Street Streetscape
Post-Bid
Vermillion, SD

33rd Street and Minnesota Avenue Intersection Reconstruction, Utility Improvements, Pavement Repairs and ADA Improvements
Results
Less than $1,760,000 est. value
Sioux Falls, SD

West 53rd Street and West Bluestem Street Watermain and Sanitary Improvements
Post-Bid
$1,600,000 est. value
Sioux Falls, SD 57106

East Watertown Street Water Main Replacement
Results
Rapid City, SD 57701

2021 Water Main Replacement Installation
Post-Bid
Wessington Springs, SD 57382

Last Updated 06/11/2021 09:16 AM
Project Title

Madison Water System Improvements Phase 1B and Phase 2

Physical Address View project details and contacts
City, State (County) Madison, SD   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $11,468,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SCHEDULE 1:Opinion of Construction Costs: $5,980,000 Furnish and Install approximately 1,813 LF of 12” diameter, 937 LF of 8” diameter and 5,841 LF of 6” diameter water main and associated service lines; Furnish and Install approximately 933 LF of 18” diameter, 185 LF of 12” diameter, 398 LF of 10” diameter and 1,994 LF of 8” diameter gravity sewer with associated service lines; Furnish and Install approximately 210 LF of Bore and Jack 26” Steel Casing Pipe Furnish and Install approximately 2,387 LF of RCP storm sewer; Furnish and Install sanitary sewer and water tracer wire systems; Furnish and Install junction boxes, manholes, valves and appurtenances; Approximately 30,330 SY of full depth roadway reclamation; Furnish and Install approximately 14,840 SY of geotextile fabric for subgrade stabilization; Furnish and Install approximately 21,350 Tons of base course; Furnish and Install approximately 29,343 SY of asphalt concrete; Furnish and Install approximately 2,903 SY of PCC approach pavement; Furnish and Install approximately 12,388 LF of concrete curb & gutter; Furnish and install approximately 27,217 SF of concrete sidewalk; Surface restoration and all other miscellaneous work required not herein mentioned, but inferred from the construction Contract Documents. SCHEDULE 2Opinion of Construction Costs: $455,000 Furnish and Install approximately 3,169 LF of 12” diameter, 120 LF of 8” diameter, and 75 LF of 6” diameter water main; Furnish and Install approximately 1,424 LF of 12” watermain by directional drill Furnish and Install water tracer wire systems; Furnish and Install valves and appurtenances; Furnish and Install 967 SY of Erosion Control Blanket Strip, Stockpile and Reinstall approximately 2,264 CY of topsoil Surface restoration and all other miscellaneous work required not herein mentioned, but inferred from the construction Contract Documents. SCHEDULE 3 Opinion of Construction Costs: $5,033,000 Base Bid Furnish and Install approximately 1,987 LF of 8” diameter and 3,271 LF of 6” diameter water main and associated service lines; Furnish and Install approximately 137 LF of watermain by directional drill Furnish and Install approximately 759 LF of 12” diameter, 370 LF of 10” diameter and 1,874 LF of 8” diameter gravity sewer with associated service lines; Furnish and Install approximately 212 LF of RCP storm sewer; Furnish and Install sanitary sewer and water tracer wire systems; Furnish and Install junction boxes, manholes, valves and appurtenances; Approximately 18,400 SY of full depth roadway reclamation; Furnish and Install approximately 7,630 SY of geotextile fabric for subgrade stabilization; Furnish and Install approximately 12,780 Tons of base course; Furnish and Install approximately 12,510 SY of base course, salvaged asphalt mix, 4” depth; Furnish and Install approximately 18,221 SY of asphalt concrete; Furnish and Install approximately 1,306 SY of PCC approach pavement; Furnish and Install approximately 7,150 LF of concrete curb & gutter; Furnish and install approximately 13,712 SF of concrete sidewalk; Surface restoration and all other miscellaneous work required not herein mentioned, but inferred from the construction Contract Documents.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents