Similar Projects
Stormwater Lining Project
Results
Parkersburg, WV

Replacement of Sanitary Sewer Pipe and Storm Drain
Infrastructure
Results
Barboursville, WV 25504

20th Street Stormwater Piping Project
Results
Parkersburg, WV 26101

Biennial Construction and Maintenance Contract
New Construction, Infrastructure
Post-Bid
Charleston, WV

Stormwater Pond 1 Diversion Project
Infrastructure
Post-Bid
Martinsburg, WV

Westover Park Storm Water and Ball Field Wall Project
Renovation, Infrastructure
Results
Westover, WV

Phase III-B Wastewater Collection and Treatment System Improvements - Forest Hills Sewer Improvements
Infrastructure
Results
Wheeling, WV 26003

Bridgeport Route 58 Pedestrian Walkway Phase 2
Infrastructure, Alteration
Results
Bridgeport, WV

Concrete Sanitary Sewer Manholes and Stormwater Structures
Infrastructure
Results
Beckley, WV

City Avenue and Pikeview Drive Sanitary Sewer and Stormwater Emergency Rehabilitation Project
Infrastructure
Results
Beckley, WV 25801

Phase II Sanitary Sewer and Stormwater Separation Project
Infrastructure
Results
Smithers, WV

Clendenin Storm Sewer Replacement Project
Infrastructure
Post-Bid
Clendenin, WV

Delaware Street Sewer Separation - Phase 03P
Infrastructure
Bidding
Wheeling, WV 26003

Church Street Storm Water Project Contract No 1
Infrastructure
Results
White Sulphur Springs, WV

Repair Storm Drain Lot 7 Laidley Lot
Infrastructure, Alteration
Results
$12,450 est. value
Charles Town, WV

Reported 01/29/2022 12:00 AM
Project Title

Storm Drain Catch Basin and Storm Drain Pipe Installation

Physical Address View project details and contacts
City, State (County) Madison, WV   (Boone County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install a storm drain catch basin and storm drain pipe. Approximately 70 feet of 18-inch storm drain on Main Street in the area of 271 Main Street. Approximately 95 feet of 18-inch storm drain pipe. Resurface the site in the construction area.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents