Similar Projects
TSA Modular Stormwater Drainage System
Infrastructure
Design
$825,658 est. value
Brunswick, GA

South Palm and Hornet Ditch Drainage Improvements
Infrastructure
Bidding
$400,000 est. value
GA

260-270 Drummen Court Drainage Improvement and Maintenance
Infrastructure
Bidding
$700,000 est. value
Atlanta, GA 30328

North 4Th Avenue Drainage And Sidewalk Improvements
Post-Bid
Rome, GA

Combined Sewer Replacement
Post-Bid
Atlanta, GA

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

First Street Resurfacing, Street, Water Extension
Results
Richmond Hill, GA 31324

Storm Drainage and Street Improvements, Hugh Taylor, Oren Sharpe, and McLendon Road
Infrastructure
Bidding
$600,000 est. value
Lyons, GA 30436

2019-2021 LMIG Street and Drainage Improvements
Post-Bid
$790,000 est. value
Homerville, GA

Harrington Lane Storm Drain Replacement Project
Results
Lawrenceville, GA 30046

Patching and Underdrain Installations on 3 Streets
Infrastructure
Bidding
$300,000 est. value
Thomasville, GA

781 James Circle Storm Drain Repair Project
Post-Bid
Lawrenceville, GA

Pike County CDBG19 - Storm Drainage and Street Improvements, Hill Top Community
Results
Less than $515,000 est. value
Zebulon, GA 30295

Northwest Harris Business Park Parcel A
Infrastructure
Bidding
$200,000 est. value
West Point, GA

Replacement Of The Turbidity Meters
Post-Bid
$60,000 to $85,000 est. value
Athens, GA

Last Updated 06/23/2022 06:24 AM
Project Title

2020 CDBG Street and Storm Drainage Improvements

Physical Address View project details and contacts
City, State (County) Eatonton, GA   (Putnam County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include storm drainage and roadway improvements through installation of 24" curb and gutter, 1.5" asphalt mill and overlay, removal of existing driveway culverts, installation of concrete headwalls, and 18", 24", 30", 36" RCP as well as 18", 24", 30" HDPE Storm Drainage Pipes.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents