Similar Projects
Park Street Reconstruction with Water Main Improvements - 18060 - City of Lapeer
Infrastructure
Conception
$890,800 CJ est. value
Lapeer, MI 48446

Park Street Reconstruction with Water Main Improvements - 18060 - City of Lapeer
Infrastructure
Conception
$890,800 CJ est. value
Lapeer, MI 48446

Murphy Oil #7092/7845 / Lapeer
Demolition, New Construction, Infrastructure - 1,351 SF
Bidding
$2,000,000 CJ est. value
Lapeer, MI 48446

Repave Parking Lot
Infrastructure
Bidding
$117,000 CJ est. value
Lapeer, MI 48446

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Bituminous Seal Patch
Infrastructure
Post-Bid
Lapeer, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Bituminous Patch In Place
Infrastructure
Results
Lapeer, MI

Center of Innovation - 2022 Bond - Lapeer Community Schools
Renovation, Infrastructure
Pending Verification
$2,323,567 CJ est. value
Lapeer, MI 48446

Lapeer High School - 2022 Bond - Lapeer Community Schools
Addition, Renovation, Infrastructure
Pending Verification
$22,022,240 CJ est. value
Lapeer, MI 48446

Albar Lift Station - 20970 - City of Lapeer
Infrastructure
Conception
$275,000 CJ est. value
Lapeer, MI 48446

Bid Package 8 Imlay City Middle School Paving
Infrastructure
Post-Bid
Imlay, MI

0.18 Mi of Hot Mix Asphalt Road Reconstruction, Concrete Curb, Gutter and Ramps, Sidewalk, Signing and Pavement Markings
Infrastructure
Results
Lapeer, MI

Lynch Elementary - 2022 Bond - Lapeer Community Schools
Renovation, Infrastructure
Pending Verification
$1,386,773 CJ est. value
Lapeer, MI 48446

Genesee Street Water Main (Millville Road to Harrison Street) - 17150 - City of Lapeer
Infrastructure
Conception
$1,749,925 CJ est. value
Lapeer, MI 48446

Last Updated 03/30/2023 03:28 PM
Project Title

Cedar Street Sidewalk

Physical Address View project details and contacts
City, State (County) Imlay City, MI 48444   (Lapeer County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $217,173 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 860 feet of 5 foot concrete sidewalk from First Street to Third Street along Cedar Street (M-53/Van Dyke). The project will include one road crossing, one driveway crossing, as well as a section underneath Grand Trunk Western / CN Railroad. Bid Security in the form of a Certified or Cashier's Check or Bid Bond for a sum no less than five percent (5%) of the amount of the Bid will be required with each Bid. No Bid may be withdrawn for a period of ninety (90) calendar days after the scheduled closing time for receipt of the Bids. The OWNER reserves the right to accept any Bid, reject any Bid, or waive irregularities in Bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents