Similar Projects
PBSO, District 6 - Chiller Replacement
Bidding
Lake Worth, FL 33467

WUD, WTP 3 - Exhaust Fans Replacement
Term Contract
Bidding
Delray Beach, FL 33446

Cooling Tower Replacement
Post-Bid
Less than $2,700,000 est. value
Boca Raton, FL 33431

PBSO Real Time Crime Lab - HVAC Upgrades
Term Contract
Post-Bid
West Palm Beach, FL 33406

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

2019 Commercial Pool Cooler
Results
North Palm Beach, FL 33408

Library Gruber Sandbox Building LY - 3
Post-Bid
Boca Raton, FL 33431

Hagen Ranch Road Library - Chiller Replacement
Results
Delray Beach, FL 33446

Pahokee Housing Authority Padgett Island / Fremd Village HVAC Project
Post-Bid
Pahokee, FL 33476

GCC - Air Handler Unit #11 Replacement
Term Contract
Results
West Palm Beach, FL 33401

Building 12 Animal Lab Renovation
Post-Bid
Boca Raton, FL 33431

MCCH - HVAC Replacement AHU #27
Term Contract
Results
West Palm Beach, FL 33401

Commercial Pool Cooler System
Post-Bid
North Palm Beach, FL 33408

MCCH - HVAC Replacement AHU #28
Term Contract
Results
West Palm Beach, FL 33401

HVAC and Air Duct Replacement and Installation
Term Contract
Post-Bid
West Palm Beach, FL 33415

Last Updated 07/07/2020 04:51 PM
Project Title

South Fire Chiller Replacement

Physical Address View project details and contacts
City, State (County) Palm Beach, FL 33401   (Palm Beach County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $160,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project is the replacement of the existing chiller plant located on the North side of the Fire Station. The existing water-cooled chiller, cooling tower, condenser water pumps, condenser water piping are to be removed. A new 35-ton air-cooled chiller shall be installed on the existing concrete pad. The chilled water pumps, air separator, expansion tank, and pot feeder shall be replaced in like-and-kind. Electrical work shall include the demolition of the conductors and conduits for the existing cooling tower and condenser water pumps back to their source. Branch circuits for the water-cooled chiller and chilled water pumps shall be demolished back to the first disconnecting means. New conductors and conduits will be provided from the new air-cooled chiller and the new pumps to their new/reused disconnecting means. The existing conductors from the existing disconnecting means to the corresponding circuit breakers are to remain and be reused. Fencing shall be modified as required to provide a secure enclosure around the equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents