Similar Projects
Northside II Water Transmission Main Relocation SH 170, Part 3
Bidding
$6,000,000 to $7,000,000 est. value
Fort Worth, TX

E. Belknap Street Water Improvements
Bidding
Haltom City, TX 76117

Tunnel Crossings of TXDOT Highways
Post-Bid
$15,800,000 est. value
Fort Worth, TX 76102

Northside II 30-Inch Water Transmission, Part 2
Post-Bid
$2,000,000 est. value
Fort Worth, TX 76102

Forest Ridge Addition and Bell Manor Units 3, 4, and 5 Water System Improvements
Results
$1,621,415 est. value
Bedford, TX

Contract 2018, WSM-L
Results
Fort Worth, TX 76102

Forest Ridge Drive 12" Water Line from Bedford Road to Harwood Road
Bidding
$993,000 est. value
Bedford, TX 76021

Water Meter Installation
Post-Bid
Fort Worth, TX 76102

City of Mansfield Upper Pressure Plane Finished Water Pipeline
Results
$2,191,479 est. value
Mansfield, TX 76063

Waterline Improvements for 3rd Street (North Road to Cory A Edwards Drive)
Post-Bid
$444,000 est. value
Kennedale, TX

FM 156 - Utility Relocations
Results
$350,000 est. value
Saginaw, TX 76179

Water and Sanitary Sewer Improvements for South Beverly Street and Race Street
Post-Bid
Crowley, TX 76036

Water and Sanitary Sewer Replacement Contract 2016 WSM-F Pt 2
Results
Fort Worth, TX 76102

Westside 2 to Westside 3 Pressure Plane Transfer
Post-Bid
Fort Worth, TX

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Last Updated 04/22/2020 06:33 AM
Project Title

Victor Henderson Building Backup Water Line

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76102   (Tarrant County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding on Hold
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Water line installation to include: 1. Approximately 450’ of boring and potholing all utility lines crossed 2. Pipe shall be 2” blue stripe below grade 3. Excavating NE corner and enter building with 2” water copper piping 4. Install heat trace tape and insulation where pipe is exposed to exterior environment 5. Install 3/4" drain valve and 2” isolation valve inside the storage room 6. Tie into existing 3/4" hose bib over head 7. Install approximately 140’ of 2" copper pipe overhead to tie into existing 2” waterline over restrooms 8. Interior piping to be hung from upper structure 9. Waterline in hallway shall be painted gray 10. All potholing and excavating shall be backfilled and smooth level grade.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents