Similar Projects
Mow Township Ditches
Term Contract
Design
Hiddenwood, ND 58779

ERate Networking
Term Contract
Sub-Bidding
Fargo, ND 58102

2023 Subgrade Repairs
Term Contract
Sub-Bidding
Stanley, ND 58784

Mowing Noxious or Other Weeds and Tall Grasses
Term Contract
Post-Bid
West Fargo, ND 58078

Pest Control
Term Contract
Post-Bid
Belcourt, ND

Flood Risk Management
Term Contract
Results
$2,384,231 CJ est. value
Fargo, ND 58102

2023 Gravel Loading and Hauling Stockpiled Aggregate
Term Contract
Sub-Bidding
Stanley, ND 58784

NDSU Campus Pest Control Services
Term Contract
Post-Bid
ND

2023 Gravel Crushing and Stockpiling
Term Contract
Sub-Bidding
Stanley, ND 58784

Window and Door Cleaning Services
Term Contract
Post-Bid
Bismarck, ND 58501

2023 Supply and Application of Calcium Chloride, Magnesium Chloride or Approved Dust Control Product To Various Roads
Term Contract
Sub-Bidding
Stanley, ND 58784

Hauling, Laying, and Compacting Hot Bituminous Pavement
Infrastructure
Post-Bid
ND

2023 Culverts
Term Contract
Sub-Bidding
Stanley, ND 58784

Aerial Mosquito Control Services
Alteration
Post-Bid
Grand Forks, ND

Audio Visual Equipment
Term Contract
Sub-Bidding
Grand Forks, ND 58202

Last Updated 02/07/2023 10:19 AM
Project Title

Sheyenne Street Tree Planting Services

Physical Address View project details and contacts
City, State (County) West Fargo, ND 58078   (Cass County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of West Fargo, North Dakota (City) is requesting proposals from qualified firms for tree planting services. The project will involve furnishing and planting of trees on Sheyenne Street. RFP packages will be accepted until noon Monday, Feb. 6, 2023. The City reserves the right to cancel this RFP in writing or postpone the date and time for submitting proposals at any time prior to the proposal due date. The City by this RFP does not promise to accept the lowest cost or any other proposal and specifically reserves the right to reject any or all proposals, to waive any formal proposal requirements, to investigate the qualifications and experience of any proposer, to reject any provisions in any proposal, to modify RFP contents, to obtain new proposals, to negotiate the requested services and contract terms with any proposer, or to proceed to do the work otherwise. In order to be fair to all proposers, no oral interpretations will be given to any proposer, as to the meaning of the specification documents or any part thereof. Every request for such a consideration shall be made in writing. Based on such inquiry, the City may choose to issue an addendum in accordance with local state laws. The City hereby notifies all proposers that it will affirmatively insure that in regard to any contract entered into, pursuant to this request, minority business enterprises will be afforded full opportunity and are encouraged to submit proposals in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award. The City reserves the right to accept or reject any and all proposals based on the best interest of the City. 1) Specification The specification shall not be interpreted as restrictive but rather as a measure of quality and performance against which all other materials will be compared. All materials furnished and methods of installation will meet or exceed City of West Fargo Tree Planting Specifications (attached). 2) Alternative Species Contractor will be responsible for providing alternative species for any tree species they are unable to procure. This will be listed on the Base Bid form. 3) Minimum Size All species of trees are required to be a minimum 1.25" caliper size. 4) Mobilization Mobilization item is for total mobilization to complete the project. Any recalls by the City to complete additional work will result in an additional mobilization payment. Any recalls by the City for correction work for defective product will not result in additional mobilization. A single mobilization may be for multiple days of project work. 5) Proposal requirements Consultants wishing to be considered for this work must submit one (1) copy of their Base Bid form (attached). 6) Consultant Selection Process a) Evaluation will include, but not be limited to the criteria below: i) Price ii) Ability to supply requested species of trees b) After a review of the proposals and the interview process, the City will then rank the candidates. The City will attempt to negotiate a satisfactory contract with that respondent. If the City is unable to reach agreement with the first respondent, the City will repeat the proposal/negotiation process with the second rated respondent, and then third rated respondents, if necessary.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents