Similar Projects
O'Reilly Auto Parts / Luling TX (LLG) 22104
New Construction, Infrastructure - 7,082 SF
Design
$1,000,000 CJ est. value
Luling, TX 78648

Construction of Hartland Ranch Phase 1
Infrastructure
Bidding
$400,000 CJ est. value
Lockhart, TX 78644

Construction of Hartland Ranch Phase 1
Infrastructure
Bidding
$400,000 CJ est. value
Lockhart, TX 78644

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Buc-ee's Travel Center #17 / Luling
Demolition, New Construction, Infrastructure - 74,707 SF
Post-Bid
$20,000,000 CJ est. value
Luling, TX 78648

Alliance Regional Water Authority Phase 1B Treated Pipeline Segment A
Infrastructure
Results
$35,000,000 to $45,000,000 est. value
TX

Phase 1B Treated Pipeline Segment B
Infrastructure
Results
$40,000,000 to $50,000,000 est. value
TX

Hershey Creamery Company Cold Storage Facility / Lockhart
New Construction, Infrastructure - 20,000 SF
Pending Verification
$11,000,000 CJ est. value
Lockhart, TX 78644

Micron Technology Fabrication Plant / Project Evergreen
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Lockhart, TX 78644

Carrizo Groundwater Supply Project Delivery Point Pipelines
Infrastructure
Results
$3,700,000 est. value
TX

Iron Ox Inc Food Processing Facility - Phase 2
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$120,000,000 CJ est. value
Lockhart, TX 78644

SH - 123 Pipeline Crossing Replacement and Pressure Relief Valve Addition
Infrastructure
Results
$775,000 est. value
San Marcos, TX 78666

Ziegenfelder Frozen Treat Company Manufacturing Facility / Lockhart
New Construction, Infrastructure - 42,000 SF
Pending Verification
$30,000,000 CJ est. value
Lockhart, TX 78644

Fire Training Facility
New Construction, Infrastructure - 4,529 SF
Results
$2,777,777 CJ est. value
San Marcos, TX 78666

The Cavalry at Lockhart Apartments / Clubhouse
New Construction, Infrastructure - 5,500 SF
Pending Verification
$5,000,000 CJ est. value
Lockhart, TX 78644

Last Updated 09/21/2022 09:44 AM
Project Title

Construction of Hartland Ranch Phase 1 Wastewater Improvements

Physical Address View project details and contacts
City, State (County) Lockhart, TX 78644   (Caldwell County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $690,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The documents will contain CAD files, pdf set of plans and bid documents. Make checks payable and mail to Carlson, Brigance and Doering, Inc. Only those checks received will have their bids considered. The Pre-Qualification Statement included in the proposal packet and as required by Caldwell County M.U.D. No. 2 shall be completed in its entirety and submitted as part of the proposal. Any proposal lacking the Pre-Qualification Statement will not be considered. Any requests received after that time and date will not be addressed. No Bid Bond is required. Proposals shall not be withdrawn for a period of 90 days after the opening of the bids. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Owner s judgment will be most advantageous to the District and result in the best and most economical completion of the Project. A Maintenance Bond will be required in the amount of 10% of the contract price and is to remain in force for a period of two years from the date of the letter of final acceptance from Caldwell County and the Caldwell County M.U.D. No. 2 and Maxwell S.U.D. Prevailing Wage Rates, in accordance with Government Code 2258 are applicable to this project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents