Similar Projects
Construction of Sanitary Sewer, Water Line, Drainage Facilities, and Paving for Veranda Townhomes, Phase 2
Bidding
League City, TX

Island Transit Trolley Barn Concrete Flood Wall
Bidding
$205,000 est. value
Galveston, TX

14th Street Ditch Improvements
Post-Bid
Texas City, TX 77590

Sabine Pass to Galveston Bay Port Arthur & Vicinity Contract 2
Post-Bid
$20,000,000 est. value
Galveston, TX

Water, Sanitary, and Drainage Facilities in Lago Mar Pod 5 Section 1
Results
Less than $1,096,990 est. value
TX

Landing Ditch Improvements at FM 518
Results
Less than $550,000 est. value
League City, TX

Island Transit Trolley Barn Deployable Flood Wall
Bidding
$400,000 est. value
Galveston, TX

Canal System Restoration, Project Site Group I
Post-Bid
Texas City, TX 77591

Bacliff Villas Drainage Restoration
Results
Less than $800,000 est. value
Galveston, TX 77550

Dickinson Bay Bird Island 2 Project
Bidding
$4,900,000 to $6,600,000 est. value
Galveston, TX

Steel Riveted Corrugated Metal Pipe
Post-Bid
Texas City, TX

9th and 11th Avenue Drainage Restoration
Results
Less than $400,000 est. value
Galveston, TX 77550

Construction of Water, Sanitary, and Drainage Facilities in Lago Mar Pod 8 Collector Road
Infrastructure
Bidding
Texas City, TX

Willow Bayou/Avenue L Drainage
Post-Bid
$1,700,000 est. value
Galveston, TX 77551

Landing at Delany Cove Detention Facilities Phase II
Results
La Marque, TX 77568

Last Updated 05/26/2021 12:11 PM
Project Title

Nature Center Shoreline Restoration Project

Physical Address View project details and contacts
City, State (County) League City, TX   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $749,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of placing approximately 300 linear feet of rip rap material to protect the shoreline and existing wetlands.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents