Similar Projects
$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Design
Less than $98,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Rfq Multiple Engineering Service
Term Contract
Bidding

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

Electrical Engineering Services
Infrastructure
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Design-Build Services Tacoma Online Learning - Tenant Improvements
Renovation - 12,961 SF
Results
$5,000,000 est. value
Tacoma, WA 98402

Maple Street Traffic Ave Pedestrian Signal
Infrastructure
Bidding
Sumner, WA

Spanaway Transit Center Phase II
Infrastructure
Post-Bid
Spanaway, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Regional A-E Environmental Services
Renovation, Term Contract
Bidding

10th Street South East Improvements
Infrastructure
Post-Bid
Puyallup, WA

NW Trek Animal Operations Area Improvements
New Construction, Demolition
Results
$644,079 est. value
Eatonville, WA 98328

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Wards Lake Park Phase 1
New Construction, Alteration
Results
$2,100,000 est. value
Lakewood, WA 98499

Reported 11/24/2021 12:00 AM
Project Title

Construction Management and Inspection Services Pavement Preservation

Physical Address View project details and contacts
City, State (County) Fife, WA   (Pierce County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The 20th Street pavement preservation project will grind and overlay 20th Street E. between Industry Drive East and 54th Avenue East and upgrade ADA ramps to current standards, and complete missing sidewalk links

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents