Similar Projects
Green Township Slip Repair Project
Bidding
Green, OH

Precast Concrete Headwalls
Post-Bid

Eckert Ditch Restoration
Post-Bid
Less than $375,430 est. value
Akron, OH 44308

Jacking and Boring Services
Term Contract
Results
Akron, Ashland, Bowling Green, Chillicothe, Delaware, Garfield Heights, Jacksontown, Lebanon, Lima, Marietta, New Philadelphia, OH

Box Culverts
Results

Jacking and Boring Services
Post-Bid

Concrete Pipes
Results

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings
Post-Bid

Slide Repair - IR 271-08.80 Slide
Results
OH

Waterloo Road Brewster Creek Culvert Replacement
Post-Bid
Less than $1,476,491 est. value
Akron, OH

Cleveland-Massillon Road Culverts Phase II
Results
Less than $218,085 est. value
Clinton, OH 44216

Ellsworth Meadows Golf Course Drainage Installation
Results
Hudson, OH 44236

Site Drainage Improvements and Related Work
Results
Twinsburg, OH 44087

Summit County Culvert Replacement and Maintenance Program
Results
Less than $317,000 est. value
Akron, OH 44308

Sand Run Parkway/Jogging Trail and Channel Improvements - Culvert 41
Results
Akron, OH 44313

Last Updated 04/01/2021 09:36 AM
Project Title

2021 East Idlewood Culvert Repair

Physical Address View project details and contacts
City, State (County) Twinsburg, OH   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair of East Idlewood box culvert over branch of Tinkers Creek. Full-depth repair of top slab, waterproofing, patching, headwalls, walk replacement and new fencing, including vegetation tree removal and restoration required to complete the project: All work shall be in accordance with the Ohio EPA requirements and City specifications. Contractor shall take all necessary precautions to prevent a backup of sewage in the main or in the existing connections during construction replacement and perform due diligence in determining approximate location of service connections not shown on the improvement plans. The discharge of untreated sewage onto the ground or into a storm sewer is prohibited per Ohio EPA.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents