Similar Projects
Seal Beach Pump Station Replacement - Orange County Sanitation District
Renovation
Bidding
$78,923,000 CJ est. value
Seal Beach, CA 90740

Pony Express Trail Bicycle, Pedestrian and ADA Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
Camino, CA 95709

Butterfly Valves for Ramona Pipeline Valve Replacement
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
San Diego, CA 92101

Irrigation Controller Replacement Project REBID
Renovation
Sub-Bidding
$75,000 CJ est. value
Santa Clarita, CA 91321

As Needed Plumbing Maintenance and Repair for Metropolitan's Iron Mountain Pumping Pump Plant Housing
Term Contract
Post-Bid
$240,000 est. value
Los Angeles, CA

Maintenance and Repair of HVAC/Plumbing in Fresno County
Alteration
Post-Bid
$24,000 est. value
Friant, CA 93626

As Needed Plumbing Maintenance and Repair for Metropolitan`s Gene Pumping Pump Plant
Term Contract
Results
$240,000 est. value
Los Angeles, CA

Building A & B Modernization Project at Chester Elementary School - Plumbing
Alteration
Results
Chester, CA 96020

RFQ Engineering - Engineering Services for the Construction of the Temperance Avenue Sewer Trunk Line
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Fresno, CA 93721

Science Center Sump Pumps
Infrastructure
Sub-Bidding
$100,000 CJ est. value
San Pablo, CA 94806

Monterey Repair Plumbing
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value
Monterey, CA

Backflow Testing And Repairs
Alteration
Results
Richmond, CA

Pure Water Monterey Groundwater Replenishment Project Injection Well Facilities, Phase 4 Project
Renovation
Bidding
Monterey, CA 93940

Urgent Plumbing Services
Alteration
Post-Bid
Fresno, CA 93721

Water Bottle Filling Station Replacements
Alteration
Results
$215,000 est. value
Santa Ana, CA

Last Updated 08/07/2023 10:26 PM
Project Title

Rebid Aeration Basin Conduit and Enclosure Installation & Final Clarifier Collector Drive Conductor Replacment

Physical Address View project details and contacts
City, State (County) Fresno, CA 93706   (Fresno County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $75,650 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. Install (6) 330-foot runs of 2" aluminum conduit along with (4) 24X30X10 stainless steel enclosures at predetermined intervals throughout the run. The conduit run will start at the existing free standing stainless junction box JB-4P and end at the last 24X30X8 enclosure. This run is to be installed on the west end of aeration basins 9&10 and will primarily run on the end wall of the basin structure. 2. Replace failed power and control conductors previously identified from electrical vault EPB13A to final clarifiers 6,7,8, & 9 long and short collector drive local control panels. Question Deadline 06/21/2023 at 5:00 PM PT Online Q&A Yes Any questions concerning this bid should be referred to the designated Procurement Specialist, James Jackson James.Jackson2@fresno.gov and may be submitted electronically by utilizing the Questions and Answers field on Planet Bids, Explanation of Bid #1 Items: C-Side Aeration Basins 9&10 conduit and Enclosure Installation Scope of work: Install (6) 330 foot runs of 2" aluminum conduit along with (4) 24X30X10 stainless steel enclosures at predetermined intervals throughout the run. The conduit run will start at the existing free standing stainless junction box JB-4P and end at the last 24X30X8 enclosure. This run is to be installed on the west end of aeration basins 9&10 and will primarily run on the end wall of the basin structure. The conduit run will start with (6) 2" aluminum conduits leaving stainless junction box JB-4P and will drop off (2) conduits each at three of the 24X30X10 stainless steel enclosures. The City of Fresno will provide the following materials: 2000 - Feet of 2" aluminum Conduit. 200 - Feet of 1-1/2 X 1-1/2 Stainless Unistrut. 4 - 24X30X10 stainless steel enclosures. 28 - 2" Meyers hubs. 4 - 2" Malleable LR condulets with covers and gaskets. 250 - 2" Rigid stainless steel strut straps. 72 - 1/2 " spring nuts. 50 - 45-degree Unistrut brackets. 50 - 1/2 X 3-3/4 Stainless steel anchors. The contractor will be responsible for suppling any additional materials needed to complete the installation of this project. Explanation of Bid #2 Items: B-Side Final Clarifiers 6,7,8 & 9 Collector Drive Conductor Replacement Scope of work: Replace failed power and control conductors previously identified from electrical vault EPB13A to final clarifiers 6,7,8, & 9 long and short collector drive local control panels. o All failed conductors are to be removed from conduits, conduits are to be cleaned out, new conductors pulled in and terminated. o All new conductor splices in vault EPB13A shall be a watertight type of splice. o All new conductors must be identified on both ends with a durable form of wire marker. o The conductors to be replaced are circuit numbers, A2-408, A2-409, A2-410, A2-411, B2-408, B2-409, B2-410 & B2-411.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents