Similar Projects
Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

Viridi Parente Laboratory Addition / Buffalo
Addition, Demolition, Infrastructure - 139,000 SF
Conception
$75,000,000 CJ est. value
Buffalo, NY 14215

Walden Avenue Grocery Store
Addition, Renovation, Infrastructure
Design
$1,500,000 CJ est. value
Buffalo, NY 14211

Rogers Road Senior Apartments
New Construction, Infrastructure
Design
$16,000,000 CJ est. value
Hamburg, NY 14075

West Parking Garage
New Construction, Infrastructure - 28,830 SF
Post-Bid
$30,000,000 CJ est. value
Buffalo, NY 14203

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

FY22 Buffalo North Breakwater Repair
Infrastructure
Results
$5,293,274 CJ est. value
Buffalo, NY 14203

Construction Work Provide Salt Storage Buildings - Tonawanda & Hamburg
New Construction, Infrastructure
Results
$2,290,649 CJ est. value
Tonawanda, NY 14150

Highmark Stadium
New Construction, Infrastructure - 1,350,000 SF
Construction
$1,540,000,000 CJ est. value
Orchard Park, NY 14127

Neighborhood Health Center Demolition and Addition / Buffalo
Addition, Demolition, Infrastructure - 15,925 SF
Construction
$3,000,000 CJ est. value
Buffalo, NY 14201

Covenant Gardens
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Hamburg, NY 14075

RFP - North Aud Block Redevelopment
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Buffalo, NY 14202

Dingens Warehouse
New Construction, Infrastructure - 150,000 SF
Conception
$15,000,000 CJ est. value
Buffalo, NY 14206

Elmwood Crossing Phase 2
New Construction, Renovation, Infrastructure - 10,123 SF
Design
$10,000,000 CJ est. value
Buffalo, NY 14222

Addition to Franco's Pizza
Addition, Demolition, Infrastructure - 554 SF
Post-Bid
$170,000 CJ est. value
Buffalo, NY 14217

Last Updated 10/10/2023 04:05 AM
Project Title

Southtowns Advanced Wastewater Treatment Facility Phase 1 Expansion

Physical Address View project details and contacts
City, State (County) Buffalo, NY 14219   (Erie County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes construction of a new final effluent pump station, chlorine contact tank, and electrical substation, improvements to the existing dichlorination system, overflow retention facility effluent piping, and outfall piping in Lake Erie, including process/mechanical, demolition, abatement of asbestos and lead-based paint, concrete, masonry, metals, thermal and moisture protection, doors and windows, painting, plumbing, heating, ventilation, and air conditioning, electrical, civil, utility, instrumentation and controls, and appurtenant Work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents