Similar Projects
Fort Bliss Blood Processing Center
- 13,838 SF
Design
$5,000,000 to $10,000,000 est. value
El Paso, TX

Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Design
$20,000,000 to $100,000,000 est. value

Dyess AFB, TX - Renovation of Deployment Control Center Bldg 4309
Post-Bid
$5,000,000 to $10,000,000 est. value
Abilene, TX

Full Facility Revitilization (FFR) Conroe, TX ARC
Renovation - 58,000 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Conroe, TX 77303

P-1594 Powertrain Facility Machining
New Construction - 206,877 SF
Results
$25,000,000 to $100,000,000 est. value
Corpus Christi, TX

Contracted Services Discount
Results
Bryan, TX 77801

Construction of New Cotton Classing Facility on Texas Tech University Campus Lubbock, Texas
New Construction
Construction
$7,000,000 to $12,000,000 est. value
Lubbock, TX

Ft. Worth Cobb Park Major Maintenance
Renovation
Construction
$5,799,000 est. value
Fort Worth, TX 76105

Combat Conditioning Center
- 24,000 SF
Post-Bid
San Antonio, TX

New Airfield Operations Building, North Fort Hood, Texas
New Construction, Demolition
Post-Bid
$1,000,000 to $5,000,000 est. value
Fort Hood, TX 76544

Last Updated 12/16/2020 01:04 PM
Project Title

63rd RD MAID-IQ Region 2, TX

Physical Address View project details and contacts
City, State (County) State-Wide: TX
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Historically Underutilized Business (HUBZone) Set-Aside: Design-Build Multiple Award Indefinite Delivery Indefinite Quantity (MAID-IQ) construction contract for the 63rd RD Region 2: purpose of the MAID-IQ is to provide construction services for a broad range of renovation and construction projects, to include repair and alteration of real property, as well as new minor construction. Work performed under these contracts will include but not be limited to the following general project categories: Construction, repair and alteration of various facilities; Construction, repairs and alteration of Electrical Systems (ES); Construction, repair and alteration of Mechanical Systems (e.g. HVAC systems, and controls), Construction, repair and alteration of Site Civil Systems, Construction, repair and alteration of Fire Protection Systems, Construction, repair and alteration of Architectural Systems. Resultant task orders may be based on Government provided 35%, 65%, or 100% designs or may require the contractor provide a design to build the project.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents