Similar Projects
Wireless Network Equipment and UPS Infrastructure
Alteration
Bidding
Moorhead, MN

DNR R4 Banning SP EV Charging Station
Post-Bid
Sandstone, MN

Replacement of UPS at the Minnesota Department of Health
Term Contract
Post-Bid
$40,000 to $60,000 est. value
Saint Paul, MN 55155

Sandy Lake Dam Network Conduit Installation
Results
Less than $25,000 est. value
McGregor, MN 55760

MnDOT Sleepy Eye Truck Station - Electrical and Mechanical
Results
Less than $4,400,000 est. value
Sleepy Eye, MN 56085

Boeckman MS Auditorium Lighting and Lighting Control Systems Replacement
Post-Bid
Farmington, MN 55024

2021 Lighting Retrofit
Renovation
Results
Lakeville, MN

McCarthy Beach SP Spring House Updates
Renovation
Post-Bid
$20,000 est. value
Side Lake, MN 55781

Downtown Electric Distribution Conversion
Results
Less than $500,000 est. value
Jackson, MN

Electrical Systems Operation and Preventive Maintenance Services
Term Contract
Post-Bid
Saint Paul, MN

Electrical Service Work
Term Contract
Results
$250,000 est. value
Moorhead, MN

Outdoor Electrical Services
Term Contract
Post-Bid
Bloomington, MN

JC Courtroom AV Upgrades
Results
Shakopee, MN 55379

Supervisory Control and Data Acquisition (SCADA) for Electrical Distribution System at Camp Ripley
Infrastructure
Post-Bid
Little Falls, MN 56345

MNDOT Heath Creek Rest Area Control Panel & Fence Upgrades
Results
$75,000 est. value
Faribault, MN 55021

Last Updated 11/19/2021 11:28 AM
Project Title

2021 Energy Savings Program P2

Physical Address View project details and contacts
City, State (County) Minneapolis, MN   (Anoka County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $529,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project has work located in both Terminal 1 and Terminal 2. The scope of work includes: demolition and replacement of chilled water and DX fan coil units; installation of new and modified chilled water piping; installation of a new exhaust fan and ductwork; removal and replacement of ceiling lights. It will also include new mechanical control devices and modifications to the IMACs graphics. Some fire protection modifications will be required. Also included are small portions of masonry work.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents