Similar Projects
Steam Kettle Replacement
Bidding
Less than $234,000 est. value
Oshkosh, WI

Gym Floor Replacement
Bidding
Eau Claire, WI 54703

Hardwood Synthetic Sports Flooring
Post-Bid

Hardwood Synthetic Sports Flooring
Post-Bid

Transfer Station Floor Replacement
Results
Oshkosh, WI 54901

Transfer Station Structural Floor Repair
Bidding
Kenosha, WI 53140

Flooring Replacement at the Youth and Family Services Building
Post-Bid
Appleton, WI 54911

Flooring Replacement in the Atrium 2 Neighborhood of Brewster Village
Bidding
Appleton, WI 54914

Job Center Concrete Floor Preparation
Post-Bid
Madison, WI 53704

Flooring Replacement
Bidding
Reedsburg, WI

Carpet Replacements
Post-Bid
Oshkosh, WI 54901

Oshkosh Safety Building Flooring Replacement
Post-Bid
Oshkosh, WI 54901

Mall/Concourse Maintenance Protective Flooring Replacement
Post-Bid
$75,000 est. value
Madison, WI 53703

Epoxy Flooring
Post-Bid
Richland Center, WI

Public Safety Building Flooring Replacement
Post-Bid
Appleton, WI 54914

Reported 12/16/2020 12:00 AM
Project Title

Lab 172 Flooring Replacement

Physical Address View project details and contacts
City, State (County) Menomonie, WI 54751   (Dunn County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $71,800
Plans Available from State Agency - 11/12/20
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: removal of approximately 4,052 square feet of asbestos containing vinyl floor tile and asbestos containing tile adhesive, as well as vinyl cove base, in lab 172 and the adjoining storage rooms and offices. An asbestos abatement company will be contracted for the removal of the vinyl tile and adhesive, as well as any base trim to be removed. A small 400 square foot classroom space within the main lab 172 will have worn carpet removed as well. The concrete substrate will be patched and repaired in areas that concrete has spalled or where machinery was previously attached to the floor. The floor will then be ground, polished to a cream finish and sealed for use. New vinyl cove base will be installed around the perimeter of all the rooms.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents