Similar Projects
Detention Pond Improvement - Pond 2 - PWFC003.0-16 - Village of Mount Prospect
Infrastructure
Conception
$835,000 CJ est. value
Mount Prospect, IL 60056

Detention Pond Improvement - Pond 6 - PWFC004.0-16 - Village of Mount Prospect
Infrastructure
Conception
$305,000 CJ est. value
Mount Prospect, IL 60056

Construction Services for 51st Street Yard Coach Maintenance Building Demolition
Demolition, Infrastructure
Sub-Bidding
$60,000 CJ est. value
Chicago, IL 60615

Summer 2023 Asbestos Work
Term Contract, Infrastructure
Sub-Bidding
$80,000 CJ est. value
Wheeling, IL 60090

(IDIQ)(MAC) for Environmental Services and Remedial Actions
Post-Bid
$50,000 to $250,000 est. value

On-Call Environmental Services
Term Contract
Post-Bid
Chicago, IL 60661

Asbestos Abatement at Jefferson Elementary School
Alteration
Results
Niles, IL 60714

Tefft MS Fire Alarm Replacement, First and Second Floor Asbestos Abatement
Alteration
Results
Streamwood, IL 60107

Detention Pond Improvement - Pond 6A - PWFC005.0-16 - Village of Mount Prospect
Infrastructure
Conception
$305,000 CJ est. value
Mount Prospect, IL 60056

2023 Asbestos Work Associated with Planned Locker Room Renovations At James B. Conant High School
Term Contract
Sub-Bidding
$300,000 CJ est. value
Hoffman Estates, IL 60169

Asbestos Abatement Services
Alteration
Post-Bid
Oak Forest, IL 60452

Lyons Township HS 2022 Asbestos Abatement
Alteration
Results
La Grange, IL 60525

Pre-Demolition Asbestos Building Components Abatement
Alteration
Post-Bid
Elk Grove Village, IL 60007

2021 Capitol/Operations - Citywide PKC-6 (Forest Glen)
Renovation
Results
$6,533,000 CJ est. value
Chicago, IL 60646

Phase 3 Engineering Services - Des Plaines Trail Improvements
Term Contract, Alteration
Post-Bid
Chicago, Rosemont, IL 60677

Last Updated 05/02/2023 01:11 PM
Project Title

Ravenswood ES - LBP Mitigation

Physical Address View project details and contacts
City, State (County) Chicago, IL 60613   (Cook County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $142,400 [brand] Estimate
Plans Available from Environmental Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All questions/requests must be received two (2) business days prior to bid closing Provide Labor and Materials: LBP Mitigation 1) LBP mitigation in Rooms Engineers Office, 005, Gym, Gym Office, and Gym Stage. 2) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 3) Not responsible for contractor errors as a result of non-field verification. 4) Materials and installation must comply with CPS Standards and Specifications as listed on a) Section 01 56 11: General Dust, Fume and Odor Control b) Section 02 86 13: Hazardous and Universal Waste Management 5) Secure job site overnight if work is not completed in one day. 6) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 7) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 8) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time Various Trades Invitation to Bid frame. 9) Contractor is to remove and dispose of materials torn out and any construction debris. 10) All trash must be removed off-site by contractor. 11) Clean the surrounding area and make sure all is swept of debris. 12) All questions/requests must be received two (2) business days prior to bid closing.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents