Similar Projects
Eastside WWTP Improvements
Bidding
$875,000 to $1,100,000 est. value
Opp, AL

North Mobile County Wastewater Treatment Plant Phase 1 Retrofit
Post-Bid
Mobile, AL 36633

D'Olive Aeration Basin Improvements
Post-Bid
Daphne, AL 36526

Fort Mcclellan WWTP Improvements
Results
Less than $5,100,000 est. value
Anniston, AL

Electrical and Process Improvements at Five Mile, Prudes and Valley Creek WWTP
Results
Less than $2,165,000 est. value
Bessemer, AL 35023

Wastewater Treatment Plant Renovation
Renovation
Construction
Less than $800,000 est. value
Geneva, AL

Trussville WRF Structural Repairs Project
Post-Bid
Less than $1,250,000 est. value
Birmingham, AL 35203

Littleville Wastewater Treatment Plant Improvements
Results
Less than $531,000 est. value
Russellville, AL 35654

Town Creek WWTP Splitter Box Improvements
Post-Bid
Jasper, AL

Construction of Town Creek Wastewater Treatment Plant 2019 Improvements
Results
Less than $574,800 est. value
Jasper, AL 35501

Econchate WPCP Primary Digester Cleaning and Sludge Removal
Post-Bid
AL

H.C. Morgan Water Pollution Control Facility Clarifier and Miscellaneous Improvements Project
Addition
Results
Auburn, AL 36832

Contract 1. Wastewater Treatment System Improvements
Post-Bid
Mosses, AL 36040

Construction of the Expansion of the Bridgeport Wastewater Treatment Plant
Results
Less than $2,900,000 est. value
Bridgeport, AL 35740

Contract 2. Wastewater Collection System Expansion
Post-Bid
Mosses, AL 36040

Last Updated 08/13/2020 08:34 AM
Project Title

Phosphorous Control Chemical Addition Improvements for the Five Mile Creek, Turkey Creek, Prudes Creek and Warrior WRFs

Physical Address View project details and contacts
City, State (County) Fultondale, AL 35068   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project provides new chemical addition facilities at Five Mile Creek, Prudes Creek and Warrior WRFs for phosphorous reduction as well as modifications to an existing chemical feed facility at Turkey Creek WRF. The final installation at each facility will include the following: * Two chemical metering pumps (1 Duty and 1 Standby) * Chemical storage tank for bulk delivery of selected chemical * Concrete slab, concrete containment, and pre-engineered canopy structure * Integration into existing SCADA system

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents