Similar Projects
Shake Shack / Des Peres
New Construction, Infrastructure - 3,453 SF
Design
$1,000,000 CJ est. value
Des Peres, MO 63131

Logan University Fuhr Science Center
Addition, Demolition, Renovation, Infrastructure - 14,400 SF
Design
$28,000,000 CJ est. value
Chesterfield, MO 63017

8 Bridge Rehabilitation, Pavement Repair
Infrastructure
Bidding
$15,000,000 CJ est. value
Saint Louis, MO 63131

ADA, Signals, Pavement Improvements
Infrastructure
Bidding
$15,000,000 CJ est. value
Saint Louis, MO 63131

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Rehabilitation of Abandoned Property
Renovation, Infrastructure
Post-Bid
Ferguson, MO

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

Weise House in Street Ferdinand Park Basement Work and Grading
Infrastructure
Results
Florissant, MO

The McKenzie
New Construction, Infrastructure
Construction
$107,500,000 CJ est. value
Saint Louis, MO 63124

West Adams Avenue Condominiums / Kirkwood
New Construction, Infrastructure - 8,817 SF
Pending Verification
$2,000,000 CJ est. value
Kirkwood, MO 63122

Real Dill Pickleball Club At The District
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Chesterfield, MO 63005

Moto Mart Gas Station and Travel Plaza
New Construction, Infrastructure - 19,227 SF
Design
$5,000,000 CJ est. value
Saint Louis, MO 63129

Jennings Station Road (North) ARS Resurfacing
Infrastructure
Bidding
$2,188,100 CJ est. value
Saint Louis, MO 63136

Property Redevelopment
Infrastructure
Post-Bid
Saint Louis, MO 63121

Gateway Arch National Park Site Improvements
Infrastructure
Results
Saint Louis, MO

Last Updated 09/13/2022 07:03 PM
Project Title

Pere Cliff Plant Removal and Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Fenton, MO 63026   (Saint Louis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $430,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project Pump Station will be located in; Pere Cliff Mobile Home Park in High Ridge, MO; with a Force Main along Antire Road to the District's Existing Pump Station located behind Dottie's Apartments in High Ridge, MO. 63049. Questions should be directed to Mr. Bob Hembrock, Executive Director, at Northeast Public Sewer District's Office. Jefferson County, Mo. 636-343-5090 Ext. 226 This project consists of 3021 lineal feet of 2" Restrained Joint PVC Force Main including 970 lineal feet of Directional Bore including (11) connection service tees. (4) Air Vacuum Release Manhole Assemblies. 440 lineal feet of 8" Gravity Sewer Construction, 3 manholes, (11) 8"x4" Wyes and service lateral. (1) 48" Pump Station Assembly with a Valve Vault and Storage Basin Structure. A block barrier Wall with a concrete surface, (92') Wrought Iron Fence including Electrical Panel Support and Roof Structure, 50'of 6" Steel Casing Bore. The Project also includes Asphalt surfacing on Pere Cliff Drive along with additional Asphalt Driveway repair and site restoration. All work for this project is confined within Roadway and Utility easement. The second portion of the Project will consist of the Abandonment and closure of the Existing Pere Cliff Plant. This includes the removal of approximately 120 CY of sand (disposed at an approved landfill or facility) demolition of (3) concrete tanks (2) - 7.33' x 10.5' x 7' deep tanks and (1) 15'x13'x8' deep. (1) sand filter concrete structure (35' x 40). (1) 5' Sq. concrete structure. Removal of 6' privacy fence. Adding approximately 170 CY of dirt to the site with surface restoration and grass. All work shall be constructed in a workmanlike manor for a complete and operational system. All work for these projects are confined within Existing or Procured easements, within the Pere Cliff Mobile Home Park, Dotties Apartments, and along Antire County Road.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents