Similar Projects
Northstar Boulevard - Tall Cedars Parkway to Braddock Road - C02375 - Loudoun County
Infrastructure
Conception
$32,895,000 CJ est. value
Ashburn, VA 20148

United States Tennis Association Mid-Atlantic HQ / Village at Clear Springs
New Construction, Infrastructure - 190,000 SF
Conception
$42,000,000 CJ est. value
Leesburg, VA 20175

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

One Gramercy and Two Gramercy / Loudoun Station Phase 2
New Construction, Infrastructure - 262,000 SF
Design
$75,000,000 CJ est. value
Ashburn, VA 20147

RFQ contractor -Prequalification for the Construction of Round Hill Station
New Construction, Infrastructure - 21,584 SF
Bidding
$16,800,000 CJ est. value
Round Hill, VA 20141

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Cattail Branch Sewer Pump Station (SPS) Upgrade - Phase III
Renovation
Results
Leesburg, VA

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Montebello Farms Residentail Development - Phase 2
New Construction, Infrastructure
Construction
$46,000,000 CJ est. value
Sterling, VA 20164

Beaverdam Reservoir Park
New Construction, Infrastructure
Construction
$16,990,000 CJ est. value
Ashburn, VA 20148

Westwind Drive - State Street to Ladbrook Drive - Loudoun County
Infrastructure
Pending Verification
$51,301,000 CJ est. value
Dulles, VA 20148

Silver District West Mixed-Use / Landbay O & N
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Dulles, VA 20166

Fire and Rescue Training Academy Expansion - Loudoun County
Addition, Demolition, Renovation, Infrastructure - 22,000 SF
Conception
$16,097,000 CJ est. value
Leesburg, VA 20175

Innovation Multifamily
New Construction, Infrastructure - 1,850 SF
Design
$135,000,000 CJ est. value
Leesburg, VA 20176

Last Updated 05/24/2023 04:21 PM
Project Title

Goose Creek Industrial Park Sewage Pump Station and Force Main

Physical Address View project details and contacts
City, State (County) Leesburg, VA 20175   (Loudoun County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $14,456,550 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 24, 2023, the project has been awarded, however, a timeline for construction has not been established as of yet. Loudoun County Sanitation Authority (DBA Loudoun Water), the Owner, invites qualified contractors to submit sealed Bids for the aforementioned project. The procurement process and the performance of the Contract shall be governed by the provisions of the Virginia Public Procurement Act (VPPA). The Work includes, but is not limited to, the following: the construction of a 416 gpm pump station. This construction includes a new pump station with a wet well configuration, construction of an emergency storage tank, the decommissioning and demolition of the existing wastewater treatment plant (WWTP), site work, gravity sewer upsizing, construction and connection and force main connection on-site Goose Creek Industrial Park Sewage Force Main: The construction of approximately 11,400 LF of 8-inch HDPE force main. Construction includes force main appurtenances and vault structures, gravity discharge manhole, downstream gravity sewer and associated site work. The procurement process and the performance of the Contract shall be governed by the provisions of the Virginia Public Procurement Act (VPPA). Question Cutoff Date: 12/27/2022 05:00 PM (ET) Bid Bond (5.0%) Partial Utilization, Milestone 1: within 300 calendar days of Notice to Proceed *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents