Similar Projects
Phase 1 - 2022 Bond Referendum - Folsom School District
Renovation, Infrastructure
Design
$3,500,000 CJ est. value
Millville, NJ 08332

Phase 2 - 2022 Bond Referendum - Folsom School District
Renovation, Infrastructure
Design
$3,500,000 CJ est. value
Millville, NJ 08332

515 Bank Street Renovations
Infrastructure
Bidding
$100,000 CJ est. value
Bridgeton, NJ 08302

Fabrication and/or Installation of Structural Steel & High and Low Pressure Pipe Work
Infrastructure
Post-Bid
$190,000 CJ est. value
Camden, NJ 08104

Rowan Medicine Building Project
New Construction, Infrastructure
Post-Bid
$6,890,000 CJ est. value
Vineland, NJ 08360

Signature Bridge Preventive Maintenance Contract 2019-1
Results
$20,000,001 to $50,000,000 est. value

Weldon Road, Bridge Over Route 15 Emergency Superstructure Replacement Township Of Jefferson, Morris County
New Construction
Results
$5,000,001 to $10,000,000 est. value

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

ADA Compliance Improvements Phase 2 - Township of Deerfield
Infrastructure
Post-Bid
$457,970 CJ est. value
Deerfield, NJ 08302

Maintenance Movable Bridge and Tunnel Repair Contract, Statewide - 2022
Renovation, Infrastructure
Results
$10,000,001 to $20,000,000 est. value

Newcomb Senior Apartments
New Construction, Infrastructure - 124,959 SF
Pending Verification
$20,000,000 CJ est. value
Vineland, NJ 08360

Burnt Mill Pond Improvements
Infrastructure
Post-Bid
$471,520 CJ est. value
Vineland, NJ 08360

Maintenance Orphan Bridge Repair Contract 2022-1
New Construction, Infrastructure
Results
Less than $5,000,000 est. value

Four Seasons At Millville - Phase 3
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Millville, NJ 08332

Last Updated 06/02/2023 09:32 AM
Project Title

Replacement of an Existing Highway Fixed Bridge Over a Navigable Waterway

Physical Address View project details and contacts
City, State (County) Millville, NJ 08332   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The replacement bridge will be a fixed bridge with a horizontal clearance of 60 feet and a vertical clearance of 3.46 feet above mean high water. The proposed project is to replace the superstructure and substructure rehabilitation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents