Similar Projects
Realign KY 86
Infrastructure
Conception
$4,000,000 CJ est. value
Irvington, KY 40146

Realign KY 86
Infrastructure
Conception
$4,000,000 CJ est. value
Irvington, KY 40146

Minor Widening of KY 992
Infrastructure
Design
$580,000 CJ est. value
Hardinsburg, KY 40143

Minor Widening of KY 992
Infrastructure
Design
$580,000 CJ est. value
Hardinsburg, KY 40143

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Southern Region Facilities Architect-Engineer Multiple Award Contracts
Results
$2,500 to $6,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Small Business South Atlantic Gulf Region 2 IDIQ Multi-Disciplinary Ae Design Services - Request For Qualifications
Results
$1,000,000 to $30,000,000 est. value

Statewide Environmental Studies Services
Infrastructure
Post-Bid

Last Updated 03/17/2023 04:21 AM
Project Title

Address Pavement Condition on US-60

Physical Address View project details and contacts
City, State (County) Harned, KY 40144   (Breckinridge County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $1,739,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Address Pavement Condition on US-60 From Milepoint 3.45 to Milepoint 12.74 Milepoints: From MP 3.450 To 12.740 Purpose and Need: Am-pavement As of March 17, 2023, the project is in Conceptual status. Anticipated Letting Year is 2025. KYTC - Address Pavement Condition on US-60 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents