Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

2021 Road Overlays
Post-Bid
Sun Prairie, WI

2021 MLS/LRIP-S Road Reconstruction and Overlay
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Winnequah Road Traffic Calming
Results
Monona, WI 53716

Promega Kepler Warehouse
Addition, Infrastructure - 135,000 SF
Construction
Fitchburg, WI 53711

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Oliv Madison
Demolition, New Construction, Infrastructure - 23,229 SF
Pending Verification
$100,000,000 CJ est. value
Madison, WI 53703

Oliv Madison
Demolition, New Construction, Infrastructure - 23,229 SF
Pending Verification
$100,000,000 CJ est. value
Madison, WI 53703

Ridgewood Way Overlay
Infrastructure
Post-Bid
Madison, WI 53713

2021 Chip Seal and Crack Seal Repair Program
Results
Fitchburg, WI

HMA Pavement - State Projects
Infrastructure
Post-Bid
Madison, Roxbury, Verona, WI

Roadwork
Results
WI

Concrete Sidewalk at Warner Park Community Recreation Center
Infrastructure
Post-Bid
Madison, WI 53704

2021 Street and Path Improvements
Infrastructure
Results
Fitchburg, WI

Last Updated 02/03/2023 09:43 AM
Project Title

Contract A - 2022 Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Marshall, WI 53559   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction complete as of October 2022 , Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $17,657 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 2, 2023, construction has been completed, however, an exact timeline for construction has not been confirmed. Contract A- 2022 Street Reconstruction is located on Sunset Court from West Park Drive to Termini and consists of the following approximate quantities: 12-inch RCP Storm Sewer (150 lineal feet), reconstruction of asphalt roadway (4,600 square yards), new concrete curb & gutter (1,100 lineal feet), and 6" concrete driveways (4,500 square feet). Appurtenances to the above construction items and additional items are included, but are not listed above. The quantities are subject to change without notice prior to document distribution. Bidders must be pre-qualified with the Village of Marshall within the last year or must be pre-qualified for this work 5 days prior to the bid deadline in accordance with Section 66.0903 of the Wisconsin Statutes. Bidders must be experienced in municipal pipeline construction. The Village of Marshall reserves the right to reject any and all bids and to waive informalities in any bid.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents