Similar Projects
Dwight Street Bridge
Demolition, New Construction, Infrastructure
Conception
$3,316,000 CJ est. value
Spring Township, PA 19609

SR 662 over Furnace Creek
Demolition, New Construction, Infrastructure
Conception
$1,523,768 CJ est. value
RuscoMBManor Twp, PA 19522

Morgantown Rd over Tributary Conestoga Creek
Demolition, New Construction, Infrastructure
Design
$1,949,522 CJ est. value
Morgantown, PA 19543

Rehrersburg Road ovr Mill Creek
Infrastructure
Design
$1,412,095 CJ est. value
Womelsdorf, PA 19567

Berkshire Boulevard Pump Station
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Wyomissing, PA 19610

23 WHM State Game Lands 61 Stage Coach Road
Infrastructure
Bidding
$200,000 CJ est. value
Kempton, PA 19529

2022 Roadwork Projects - Contract No. 1 and Contract No. 2
Infrastructure
Post-Bid
$1,550,000 CJ est. value
South Heidelberg Township, PA 19565

Construction of Athletic Facilities Improvements for Wilson High School
New Construction
Post-Bid
Reading, PA 19609

2022 Street Improvements Project
Infrastructure
Results
$74,040 CJ est. value
Shoemakersville, PA 19555

Fleetwood Pedestrian Bridge and Bandshell Project
Infrastructure
Results
$420,200 CJ est. value
Fleetwood, PA 19522

RFP D/B - SR 2014 Corridor Improvement
Infrastructure
Construction
$2,644,573 CJ est. value
Wyomissing, PA 19610

New STEM Public School / Former Reading Outlet Center - Reading School District
New Construction, Infrastructure - 145,000 SF
Pending Verification
$71,000,000 CJ est. value
Reading, PA 19604

Valley Logistics Park / Maxatawny Township
Demolition, New Construction, Infrastructure - 2,000,000 SF
Pending Verification
$108,000,000 CJ est. value
Maxatawny Township, PA 19530

PA143 over Trib Maiden Creek
Infrastructure
Conception
$903,468 CJ est. value
Lenhartsville, PA 19534

Donat Road over Stoney Run
Demolition, New Construction, Infrastructure
Design
$1,621,440 CJ est. value
Kutztown, PA 19530

Last Updated 01/04/2023 11:40 AM
Project Title

Governor Mifflin School District New Construction of the Community Athletic Building

Physical Address View project details and contacts
City, State (County) Shillington, PA 19607   (Berks County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $24,480,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Last Day for Question 2/8/2022 Governor Mifflin School District Community Athletic Building BIDS ARE INVITED ON A LUMP SUM BASIS FOR THE FOLLOWING PRIME CONTRACTS: Contract #1 - General Construction Contract #2 - Site Construction Contract #3 - Fire Protection Systems Construction Contract #4 - Plumbing Systems Construction Contract #5 - HVAC Systems Construction (ESSER Funded Contract) Contract #6 - Electrical Systems Construction Electronic or faxed bids will not be accepted. No award of the contract will be made at the bid opening Notice to Proceed Goal 03/18/2022 Substantial Completion Date 08/18/2023 Earth Engineering Incorporated (EEI) has completed the geotechnical investigation for a 2-story steel framed structure (Athletic Community Building) and expansion of two (2) existing parking lots at the Governor Mifflin Middle and High School campus located at 10 South Waverly Street, Shillington in Berks County, Pennsylvania. The objective of this study was to evaluate the subsurface conditions within the proposed development areas. Based on the encountered conditions and the results of the testing performed for this project, EEI has developed preliminary geotechnical recommendations to aid in the design and construction of the proposed structures, as well as general earthwork and construction guidelines for the development of this site. This study was performed in general accordance with EEIs proposal BB-19733, dated April 1, 2021. The scope of work for this project included a test boring investigation, a geologic analysis of site conditions, laboratory testing of soil samples, pavement design and a geotechnical engineering analysis of the data obtained. The following report sections present the results of our field and laboratory investigations and documents our recommendations regarding the geotechnical engineering aspects of this project. Estimated Costs of the Bid Packages: 1 General Construction $12,205,000 2. Site Construction $5,030,000 3. Fire Protection Systems Construction $360,000 4.Plumbing Systems Construction $1,235,000 5. HVAC Systems Construction - ESSER Funded Contract $3,300,000 6. Electrical Systems Construction $2,350,000 *This project has been identified as part of a stimulus package

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents